Naval Submarine Base Kings Bay Maintenance Dredging Entrance Channel Camden County, Georgia - Nassau County, Florida
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The project is located in Camden County, Georgia and Nassau County, Florida, and consists of a Base and Option A. Base project work involves maintenance dredging of the Kings BayEntrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site ODMDS)(D/A-O), the FernandinaNearshore Placement Area (P/A-N), and the North Beach Placement Area (P/A-NB). Incidental work includes turbidity monitoring, environmental species monitoring, vibration monitoring,beach fill quality control, beach tilling, screening, and sea turtle and sturgeon trawling. Option A work includes tilling and escarpment removal at Fort Clinch Placement Area (P/A-F) beachportion only, not groins area.