Naval Submarine Base Kings Bay Maintenance Dredging Entrance Channel Camden County, Georgia - Nassau County, Florida
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Please note updated bid opening information below.
_______________________________________________________________________________
Microsoft Teams Need help?
Join the meeting now
Meeting ID: 993 462 786 658
Passcode: LA6FW6rY
Dial in by phone
+1 601-262-2433,,400115977# United States, Vicksburg
Find a local number
Phone conference ID: 400 115 977#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
The project is located in Camden County, Georgia and Nassau County, Florida, and consists of a Base and Option A. Base project work involves maintenance dredging of the Kings BayEntrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site ODMDS)(D/A-O), the FernandinaNearshore Placement Area (P/A-N), and the North Beach Placement Area (P/A-NB). Incidental work includes turbidity monitoring, environmental species monitoring, vibration monitoring,beach fill quality control, beach tilling, screening, and sea turtle and sturgeon trawling. Option A work includes tilling and escarpment removal at Fort Clinch Placement Area (P/A-F) beachportion only, not groins area.