Nez Perce Clearwater NF - GAC Site Preparation Construction

SOL #: 1240LU26Q0027Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Grangeville, ID

NAICS

Site Preparation Contractors (238910)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 19, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for Grangeville Air Center Site Preparation Construction in Grangeville, ID. This Combined Synopsis/Solicitation (RFQ) seeks a contractor for site improvements to establish a new temporary office complex and RV site hookups. The estimated magnitude of construction is between $250,000 and $500,000. Proposals are due March 19, 2026, at 4:00 PM MT.

Scope of Work

The project involves comprehensive site preparation and utility installation at the Grangeville Air Center. Key deliverables include:

  • Site preparation and foundation construction for two buildings.
  • Installation of telecommunications and plumbing services to four building pads.
  • Construction of gravel pads and a lift station for sanitary sewer.
  • Installation of a new transformer, electrical connection panels, and utility connections for modular buildings.
  • An optional item for RV trailer hookups.
  • All necessary labor, equipment, supervision, and permits.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Period of Performance: October 1, 2026, to June 1, 2027
  • Magnitude: Between $250,000 and $500,000
  • Set-Aside: Total Small Business Set-Aside (NAICS 283910, Size Standard $19.5 Million)
  • Bonds: A 20% Bid Bond/Offer Guarantee is required with submission. Performance and Payment Bonds (100% of award price) are due within 10 days of award.
  • Wage Rates: Davis-Bacon prevailing wage rates apply.

Submission & Evaluation

  • Submission Deadline: March 19, 2026, at 4:00 PM MT.
  • Submission Method: Email to lisa.rakich@usda.gov.
  • Required Documents: Quote, updated Price Schedule (Attachment 2, per Amendment 0001), Past Performance/Experience Questionnaire (Attachment 6), Written Technical & Logistical Approach, and Bid Guarantee. Offerors must acknowledge Amendment 0001.
  • Evaluation Criteria: Award will be based on a best value determination through comparative analysis of Relevant Experience, Past Performance, Technical Approach, and Price.

Key Updates & Notes

  • Amendment 0001 (March 11, 2026) updated the Schedule of Items, specifically changing the unit of measure for Item 32A to 'CY'.
  • Questions & Answers were posted on March 13, 2026, clarifying details such as an encouraged site visit and confirming an 18" culvert is part of the scope, with Amendment 0002 anticipated to address this oversight.
  • Weed-free equipment is a mandatory requirement for entry into the project area.

People

Points of Contact

Lisa RakichPRIMARY
Susan GravesSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View