Nez Perce Clearwater NF - GAC Site Preparation Construction

SOL #: 1240LU26Q0027Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Grangeville, ID

NAICS

Site Preparation Contractors (238910)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 19, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for Grangeville Air Center Site Preparation Construction in Grangeville, ID. This Total Small Business Set-Aside opportunity involves site preparation, foundation work, and utility installations for a new temporary office complex and RV hookups. The project has an estimated magnitude between $250,000 and $500,000, with a performance period from October 1, 2026, to June 1, 2027. Proposals are due March 19, 2026, at 4:00 PM PT.

Scope of Work

This project focuses on site improvements for the Nez Perce-Clearwater National Forests Grangeville Air Center. Key deliverables include:

  • Site preparation and selective demolition (helipads, pavements).
  • Foundation construction for two buildings.
  • Installation of telecommunications, plumbing, and electrical services to four building pads.
  • Construction of gravel pads and a lift station for sanitary sewer.
  • Installation of a new transformer, electrical connection panels, and utility connections for modular buildings.
  • Inclusion of an 18" culvert (as clarified by Q&A).
  • Optional Item 001 for RV trailer hookups (2). The contractor is responsible for all labor, equipment, supervision, and compliance with regulations, including weed-free equipment and Davis-Bacon wage rates.

Contract Details

  • Contract Type: Firm Fixed Price
  • Magnitude of Construction: Between $250,000 and $500,000
  • Period of Performance: October 1, 2026, to June 1, 2027
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 283910 Site Preparation Contractors (Small Business Size Standard: $19.5 million)
  • Bonds: A 20% Bid Bond/Offer Guarantee is required with submission. Performance & Payment Bonds (100% of award price) are due 10 days after award.

Submission & Evaluation

  • Submission Deadline: March 19, 2026, at 4:00 PM PT
  • Submission Method: Email to lisa.rakich@usda.gov
  • Required Documents: Quote, the latest Price Schedule (Attachment 2), Past Performance/Experience Questionnaire (Attachment 6), Written Technical & Logistical Approach, and Bid Guarantee.
  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on a comparative analysis of Relevant Experience, Past Performance, Technical Approach, and Price.

Key Updates & Notes

This solicitation has been updated by Amendment 0001 (March 11, 2026) and Amendment 0002 (March 13, 2026). Offerors must acknowledge all amendments and use the newest Item Schedule for Pricing. A final Questions & Answers document was posted on March 13, 2026, clarifying scope items like the 18" culvert and the inclusion of Alternate #1 in Optional Item 001. A site visit is highly encouraged.

People

Points of Contact

Lisa RakichPRIMARY
Susan GravesSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View