NH-30 Chiller Replacement

SOL #: N4008526R0077Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Norfolk, VA

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 5, 2026
2
Last Updated
Feb 25, 2026
3
Submission Deadline
Mar 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFAC MID-ATLANTIC, is soliciting proposals for the NH-30 Chiller Replacement project at Naval Support Activity (NSA), Norfolk, Virginia. This Total Small Business Set-Aside opportunity is exclusively for Multiple Award Construction Contract (MACC) holders (Contract Nos. N4008524D2508/2509/2510/2511/2512) primarily in the Hampton Roads Area. The project involves replacing a 50-Ton air-cooled chiller and its associated controls. Proposals are due Monday, March 9, 2026, by 1400 EDT.

Scope of Work

The project requires the Design-Build (DB) / Design-Bid-Build (DBB) replacement of the existing 50-Ton outdoor air-cooled chiller and all related controls in Building NH-30. The scope includes:

  • Demolition: Shut down, disconnect, evacuate refrigerant, and remove the existing 50-Ton chiller, including mechanical and electrical components, via crane. Demolition extends to associated conduit and wiring.
  • New Installation: Install a new 50-Ton air-cooled chiller on the existing concrete pad, connect chilled water lines, integrate new controls with the building automation system, and perform testing and balancing.
  • Electrical Work: Provide and connect a new 300A, 3P circuit breaker and a 400A, 3P fused disconnect, with new conduit and wiring between the switchboard and the chiller.
  • Site Cleanup: Dispose of all demolished materials off-base and maintain a clean job site daily.
  • Work must comply with industry practices, applicable codes, and Unified Facilities Criteria. An Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) are required 15 calendar days prior to the pre-performance conference.

Contract Details

  • Contract Type: Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) Task Order.
  • Period of Performance: 240 calendar days from task order award.
  • Estimated Budget Range: $250,000 to $500,000.
  • NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors.
  • Liquidated Damages: $219.96 per calendar day for delay.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Eligibility: Restricted to specific SB MACC Contract Holders.

Submission & Evaluation

  • Proposal Due Date: Monday, March 9, 2026, by 1400 EDT.
  • Submission Method: Electronically via the PIEE Solicitation Module. Late proposals will not be considered.
  • Evaluation Criteria: Award will be made on a fair opportunity basis to the responsible offeror providing the lowest price. Evaluation is price-only.
  • Proposal Acceptance Period: 120 days from receipt of offers.
  • Pricing: Bidders must use the provided Price Proposal Form (Attachment H) for the base bid and optional CLINs (temporary chiller, refrigerant reclaiming, start-up/testing). A 100% Performance Bond is required.

Key Requirements & Attachments

  • Site Visit: A site visit was held on February 11, 2026. The Site Visit Log is available (Amendment 01).
  • Drawings: Detailed architectural and engineering drawings (Attachment B) are critical for understanding the project.
  • Wage Determination: Attachment C provides prevailing wage rates for Norfolk County, VA.
  • Compliance: Review Attachment J (FAR 52.204-24 on Telecommunications) and Attachment K (Additional Clauses and Provisions, including supply chain security, ByteDance, Xinjiang, Russian Fossil Fuel, cyber incident reporting) for critical compliance requirements.
  • Inquiries: Submit Pre-Proposal Inquiries (PPIs) using Attachment F, due 14 days prior to the proposal due date.
  • PIEE Access: Refer to Attachment G for PIEE Vendor Access Instructions to ensure proper submission.
  • Amendments: Acknowledge all amendments using Attachment I.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Feb 25, 2026
View
Version 4Viewing
Solicitation
Posted: Feb 25, 2026
Version 3
Solicitation
Posted: Feb 11, 2026
View
Version 2
Solicitation
Posted: Feb 9, 2026
View
Version 1
Solicitation
Posted: Feb 5, 2026
View
NH-30 Chiller Replacement | GovScope