Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota
SOL #: 1240LT26Q0053Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States
Place of Performance
Spearfish, SD
NAICS
Highway (237310)
PSC
Construction Of Parking Facilities (Y1LZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 21, 2026
2
Submission Deadline
May 26, 2026, 4:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is seeking quotes for the Northern Hills Ranger District Parking Lot Reconstruction in Spearfish, South Dakota. This project addresses significant structural, grade, and drainage issues to enhance public health, safety, and access. This is a Total Small Business Set-Aside. Quotes are due May 26, 2026, at 10:00 MDT.
Scope of Work
The project involves comprehensive reconstruction of the parking lot, which currently suffers from inadequate sub-base, clay-rich soil, and extensive alligator cracking. Key tasks include:
- Demolition: Removal of existing asphalt, concrete, fencing, and lighting.
- Site Preparation: Regrading the site and placing proper aggregate base materials.
- Paving: Installation of new concrete and asphalt paving.
- Infrastructure: Adding new drainage systems, sidewalks, and designated walking areas.
- Accessibility & Safety: Improving accessible parking and enhancing site lighting.
- Other: Installation of new fencing. The Statement of Work (SOW) details specific requirements for earthwork, paving, joint sealants, pavement markings, chain link fences, and exterior LED lighting. Detailed architectural and engineering drawings are provided to illustrate the full scope, including existing conditions, demolition plans, erosion control, grading, and electrical systems.
Contract Details
- Type: Firm Fixed Price (RFQ)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M)
- Project Magnitude: Between $1,000,000 and $5,000,000
- Period of Performance: June 8, 2026, through December 11, 2026
- Place of Performance: Northern Hills Ranger District, 2014 North Main Street, Spearfish, South Dakota, 57783
Submission & Evaluation
- Questions Due: May 13, 2026, 10:00 MDT
- Quotes Due: May 26, 2026, 10:00 MDT
- Submission Method: Email quotes to Contract Specialist Holly Hlavac (Holly.Hlavac@usda.gov) and Contracting Officer Lucas Dahlman (Lucas.Dahlman@usda.gov).
- Evaluation Criteria: Quotes will be evaluated using a comparative methodology to determine the best value, considering:
- Technical Approach: A detailed 2-4 page explanation, including a construction schedule (Gantt chart).
- Past Performance: Description of similar contract experience within the last 5 years, with a reference list.
- Price: Submitted on "Attachment 2 - Schedule of Items," evaluated for fairness and reasonableness. Line-item pricing must be rounded to the nearest whole dollar.
- Mandatory Requirements: A Bid Bond/Offer Guarantee (SF24) for 20% of the total offer price (not to exceed $3M) is required with the offer. Failure to provide will render the offer non-responsive. 100% Performance and Payment Bonds (SF 25, SF 25A) are required within 10 calendar days after award. Offerors must hold prices for 60 calendar days.
Important Notes
- A site visit is scheduled for May 6, 2026, at 1:00 PM MST. Attendance is highly encouraged but not mandatory.
- The solicitation includes a DBA Wage Determination (SD20260001) for Heavy and Highway Construction in South Dakota, which bidders must incorporate into their cost estimates.
- Contractors should demonstrate strong communication skills and experience in general contracting, road construction, or campground construction. An onsite superintendent is required.
People
Points of Contact
Holly HlavacPRIMARY
Lucas DahlmanSECONDARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026