NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

SOL #: 12FPC326B0012Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

MA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 19, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
Jun 18, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA), specifically the Natural Resources Conservation Service (NRCS), is soliciting bids for the Tyler Dam Rehabilitation Project Floodwater Retarding Dam in Marlborough, MA. This is a Combined Synopsis/Solicitation for a Firm Fixed-Price contract to rehabilitate the existing dam to meet current safety and performance standards. This acquisition is a Total Small Business Set-Aside. Bids are due by June 18, 2026, at 1:00 PM ET.

Scope of Work

The project involves comprehensive rehabilitation of the Tyler Dam to address inadequate auxiliary spillway capacity and ensure compliance with safety and performance standards. Major work items include:

  • Excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency.
  • Installing a geosynthetic clay liner in the auxiliary spillway approach.
  • Raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation.
  • Constructing a concrete crest wall where Robin Hill Street intersects the top of the dam.
  • Replacing concrete joint sealant above the waterline in the auxiliary and principal spillway conduits.
  • Replacing existing chain-link fencing surrounding the auxiliary spillway drop structure.
  • Removing trees within 20 feet of the right upstream embankment groin. Detailed specifications for 32 bid items, including clearing, concrete demolition, earthwork, and various material specifications, are provided in "Attachment 1 Specifications.pdf".

Contract Details

  • Contract Type: Firm Fixed-Price
  • Estimated Value: Between $950,000.00 and $1,100,000.00
  • Period of Performance: Construction completion estimated by November 1, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237990 - Other Heavy and Civil Engineering Construction
  • Product Service Code: Y1QA - Construction Of Restoration Of Real Property (Public Or Private)
  • Place of Performance: Marlborough, MA 01752

Submission & Evaluation

  • Bids Due: June 18, 2026, by 1:00 PM ET.
  • Submission Method: Email bids to mark.domingo@usda.gov.
  • Questions Due: June 5, 2026, by 1:00 PM ET, via email to mark.domingo@usda.gov.
  • Evaluation Criteria: Award will be made to the responsible bidder whose conforming bid is most advantageous to the Government, considering only price. The government may reject bids with materially unbalanced pricing or unrealistically low prices.
  • Bond Requirements: A bid bond of 20% of the bid price (up to $3 million) is required. A Payment Bond (SF-25A), Irrevocable Letter of Credit (ILC), or Tripartite Escrow Agreement for 100% of the project cost is required within 10 calendar days of award.
  • Eligibility: Interested contractors must be registered in the System for Award Management (SAM).

Site Visit & Additional Information

A site visit is scheduled for Wednesday, May 27, 2026, at 10:00 AM ET at the project site: 200 Robin Hill Street, Marlborough, MA 01752. Construction drawings ("Attachment 2 Tyler Dam Drawings.pdf"), specifications, and wage rates ("Attachment 3 - WD MA20250006 1-30-2026.pdf" and "Attachment 4 - WD MA20250008 1-2-2026.pdf") are posted and available. Provisions and clauses are effective through Federal Acquisition Circular 2026-01 (March 13, 2026).

People

Points of Contact

Mark DomingoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam | GovScope