NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave

SOL #: 6982AF26B000003Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Amargosa Valley, NV

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 1, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
Jun 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Central Federal Lands Highway Division (CFLHD) is soliciting bids for the reconstruction and rehabilitation of approximately 20 miles of roadway in Pahrump, Nye County, Nevada. This project, titled "NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave," aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue, which provide access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The estimated cost range for this Firm Fixed Price opportunity is $20,000,000 to $40,000,000.

Scope of Work

The project encompasses comprehensive roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Key tasks include:

  • Full-Depth Reclamation (FDR): Approximately 22 miles at 4-inch depth and 10 miles at 8-inch depth.
  • Aggregate Base: Installation of 30,000 - 50,000 tons.
  • Asphalt Paving: Application of 65,000 - 80,000 tons.
  • Culvert Replacement: Including some requiring approximately 10 feet of excavation, totaling 1,000 - 2,500 linear feet of 24-inch culvert. Detailed engineering plans, a hydrology and hydraulics report, and a pavement design report provide specific requirements for quantities, drainage structures, and pavement sections.

Contract Details

  • Contract Type: Firm Fixed Price Solicitation (IFB)
  • Estimated Value: $20,000,000 - $40,000,000
  • Set-Aside: Full & Open Competition with HUBZone Price Preference. The NAICS code is 237310 (Highway, Street & Bridge Construction) with a $45 million small business size standard. HUBZone small business concerns may elect to waive the evaluation preference.
  • Period of Performance: Work must commence within 10 calendar days after Notice to Proceed. Schedule A (Bob Ruud Memorial Highway) completion is targeted for July 23, 2027, and Schedule B (Bell Vista Avenue) for September 3, 2027.
  • Place of Performance: Pahrump, Nye County, Nevada.

Submission & Evaluation

  • Bid Submission Deadline: June 2, 2026, at 2:00 p.m. local time.
  • Technical Questions Deadline: May 22, 2026, at 4:00 p.m.
  • Submission Method: Bids must be submitted in printed copy to the address specified in SF-1442; electronic bids will not be accepted.
  • Evaluation Criteria: Bids will be evaluated based on price and price-related factors. Schedule B will be evaluated first, followed by Schedule A if funds are not available for Schedule B. A 10% price evaluation factor will be applied to all offers, except for HUBZone small business concerns (who have not waived the preference) and otherwise successful small business concerns.
  • Requirements: Offerors must be registered in the System for Award Management (SAM) and a Bid Guarantee is required. Applicable regulations include FAR, RFO, TAR, and Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Contact Information

For inquiries, contact Denise Martinez or Ryan Phillips at CFLAcquisitiions@dot.gov.

People

Points of Contact

Denise MartinezPRIMARY
Ryan PhillipsSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 3
Solicitation
Posted: May 7, 2026
View
Version 2Viewing
Solicitation
Posted: May 1, 2026
Version 1
Pre-Solicitation
Posted: Apr 1, 2026
View