NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave

SOL #: 6982AF26B000003Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Amargosa Valley, NV

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 1, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
Jun 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Central Federal Lands Highway Division (CFLHD), part of the Federal Highway Administration, is soliciting bids for the NV FLAP NYE 10(1) Bob Ruud Memorial Highway & Bell Vista Avenue project. This project involves the reconstruction and rehabilitation of approximately 20 miles of roadway in Pahrump, Nye County, Nevada, aiming to improve safety and drainage. The estimated cost range is $20,000,000 to $40,000,000. This is a Full and Open Competition with HUBZone Price Preference. Bids are due June 2, 2026, at 2:00 p.m. local time.

Scope of Work

The project encompasses comprehensive roadway improvements, including:

  • Roadway Reconstruction and Rehabilitation: Approximately 20 miles of Bob Ruud Memorial Highway and Bell Vista Avenue.
  • Pavement Work: Full-depth reclamation (FDR) (4-inch depth for 22 miles, 8-inch depth for 10 miles), installation of new aggregate base (30,000 - 50,000 tons), and asphalt paving (65,000 - 80,000 tons).
  • Drainage Improvements: Culvert replacement (requiring up to 10 feet of excavation), with specific quantities for 24-inch culverts (1,000 - 2,500 LNFT). Detailed hydrology and hydraulics reports provide recommendations for existing and proposed drainage structures.
  • Safety Improvements: Includes signing, striping, pavement markings, rumble strips, and temporary traffic control.

Key documents provide detailed engineering plans, cross-sections, quantity summaries, and a comprehensive pavement design report, which are critical for understanding existing conditions, subsurface soil properties, and design requirements.

Contract Details & Timeline

  • Contract Type: Firm Fixed Price.
  • Estimated Cost: $20,000,000 - $40,000,000.
  • Period of Performance: Work to begin within 10 calendar days of Notice to Proceed. Schedule A completion by July 23, 2027; Schedule B completion by September 3, 2027.
  • Anticipated Advertisement: May 2026.
  • Anticipated Award: June 2026.
  • Tentative Project Completion: May 2027 (overall).

Submission & Evaluation

  • Bid Submission Deadline: June 2, 2026, at 2:00 p.m. local time.
  • Submission Method: Printed copy only, to the address specified in Item 8 of SF-1442. Electronic bids will not be accepted.
  • Technical Questions Deadline: May 22, 2026, at 4:00 p.m.
  • Evaluation Criteria: Bids will be evaluated based on price and price-related factors. Schedule B will be evaluated first, then Schedule A if funds are not available for Schedule B.
  • Set-Aside: Full & Open Competition with a 10% price evaluation factor applied to offers from HUBZone small business concerns (unless waived) and other small business concerns.
  • NAICS Code: 237310 (Highway, Street & Bridge Construction) with a $45 million small business size standard.
  • Requirements: Offerors must be registered in SAM. A Bid Guarantee is required. Applicable regulations include FAR, RFO, TAR, and FP-14.

Contact Information

For inquiries, contact Denise Martinez or Ryan Phillips at CFLAcquisitiions@dot.gov.

People

Points of Contact

Denise MartinezPRIMARY
Ryan PhillipsSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: May 7, 2026
Version 2
Solicitation
Posted: May 1, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 1, 2026
View