NVARNG AASF Fuel Farm Pump and Motor Repair
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Nevada Army National Guard (NVARNG) AASF is soliciting proposals for the repair and maintenance of its fuel farm pump and motor at the Harry Reid Training Center in Reno, NV. This Total Small Business Set-Aside opportunity involves replacing the fuel farm motor, rebuilding the pump, and repairing the fuel meter to ensure reliable fuel delivery to refueling vehicles. Proposals are due by May 6, 2026.
Scope of Work
The requirement is for non-personal services to restore the fuel farm's operational capability. Key objectives include:
- Replacing the fuel farm Motor.
- Rebuilding the pump.
- Repairing the fuel meter. The work also encompasses mobilization, provision of labor, equipment, and tools, a system check for leaks, clean-up, and demobilization. The goal is to return the motor, pump, and meter to full working order, with daily inspection of fuel samples and monitoring during refueling.
Key Equipment Details
Responses to industry questions have clarified specific equipment details:
- Pumping Unit: Gorman-Rupp Pumps Model No. RD3A31 BAR.
- Motor: Baldor Electric Co., 40 HP, 460 Volts, 44 Amps, 3545 RPM, 60 HZ, 3 Phase, Class H, NEMA NOM EFF 92.4%, PF 91%. The data plate is weather-worn but provides these specifications.
- Installation: The unit is installed at a fixed refueling rack location.
- Drive Configuration: Coupled system.
- Meter: Veeder-Root 7889 Meter Preset and Ticket Printer (additional pictures provided).
Contract & Timeline
- Contract Type: Firm Fixed Price for each line item.
- Period of Performance: June 1-12, 2026, for each task (Motor Replacement, Pump Rebuild, Meter Repair).
- Set-Aside: Total Small Business.
- Proposal Due Date: May 6, 2026, 06:30 AM PDT.
- Site Visit: An optional site visit was held on April 16, 2026, at 11:00 AM PST at the Harry Reid Training Center, 20000 Army Aviation Drive, Reno, NV 89506. Attendance was not mandatory.
- Questions Due: April 21, 2026, 11:30 PM PDT.
Evaluation Factors
The Government will award a contract based on the most advantageous offer, considering:
- Price
- Conformance to Technical Requirements
- Past Performance
Special Requirements
Contractor personnel must undergo a valid local background check and complete specific training (AT level 1, iWATCH, OPSEC). Employees must possess and maintain current appropriate training and professional certification. The contractor is responsible for furnishing all necessary supplies, equipment, services, and materials not explicitly provided by the Government.