Oil Water Separator Design/Install

SOL #: FA489726B0004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
Apr 30, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting unpriced technical proposals for the design and installation of a 300 GPM Oil Water Separator (OWS) at Mountain Home Air Force Base, ID. This project aims to remove 99% of hydrocarbons from the sanitary waste stream of Building 270. This acquisition is a Women-Owned Small Business (WOSB) Set-Aside and is being conducted using a Two-Step Sealed Bidding process. Technical proposals are due April 30, 2026.

Scope of Work

The project involves installing a gravity-fed OWS with integrated sensors for real-time monitoring. The OWS must capture and remove 99% of free and dispersed hydrocarbons larger than 20 microns. Work includes excavation, shoring, foundations, plumbing, site electrical work, controls/alarms, and commissioning. Special precautions are required for working on the airfield to prevent foreign object debris (FOD) and personnel will undergo additional screening. The system must comply with EPA, DoD, and NPDES regulations, and various technical standards including UFC 3-240-01, 40 CFR Part 112 and 122, NFPA, NEC, and Idaho State Environmental Codes.

Contract Details

  • Contract Type: Firm Fixed Price
  • Estimated Magnitude of Construction: $250,000 to $500,000
  • Project Duration: 210 days construction / 210 days total
  • PSC: Z2JZ (Repair or Alteration of Miscellaneous Buildings)
  • NAICS: 236220 (Commercial and Institutional Building Construction)
  • Set-Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
  • Small Business Size Standard: $45,000,000

Two-Step Sealed Bidding Process

  1. Step 1 (This RFTP): Offerors submit an unpriced technical proposal addressing requirements and evaluation criteria. No pricing information is permitted. Proposals will be evaluated for a high probability of successful performance.
  2. Step 2 (Invitation for Bids): Offerors with acceptable technical proposals from Step 1 will be invited to submit a sealed price bid. The contract will be awarded to the responsible bidder with the lowest-priced bid.

Evaluation Factors (Step 1)

Technical proposals (limited to 20 pages) will be evaluated in descending order of importance:

  1. Technical Approach and Understanding of Project Requirements
  2. Relevant Experience and Past Performance (at least two comparable OWS projects of 150GPM+ within 5 years)
  3. Key Personnel Qualifications and Organizational Structure
  4. Safety Program (record and culture)
  5. Excavation Plan (soil management, shoring, utility protection)

Key Dates & Contacts

  • Site Visit: April 16, 2026, 10:00 AM MDT. Attendee information due by April 9, 2026.
  • Questions Due: April 22, 2026, 10:00 AM MST (per Amendment 1).
  • Technical Proposals Due: April 30, 2026, 4:00 PM MDT.
  • Primary Point of Contact: Gage Bergman (gage.bergman@us.af.mil)
  • Secondary Point of Contact: SrA Deivid Baez (deivid.baez.co@us.af.mil, 208-828-3115)

People

Points of Contact

Gage BergmanPRIMARY
SrA Deivid BaezSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: May 6, 2026
View
Version 3
Solicitation
Posted: Apr 29, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 16, 2026
Version 1
Solicitation
Posted: Mar 31, 2026
View