OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT

SOL #: W912P525BA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST NASHVILLE
NASHVILLE, TN, 37203-1070, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 7, 2025
2
Last Updated
Feb 19, 2025
3
Submission Deadline
Mar 10, 2025, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Amendment 0002: The purpose of Amendment 0002 to Solicitation W912P525BA001 is to incorporate the following changes:

1) Extend the deadline for bidder inquiry from 14 February 2025 to 24 February 2025.

2) Extend the deadline for receipt of bids from 24 February 2025 to 10 March 2025 at 12:00PM Central Time.

3) Provide Government answers to questions received from Industry.

4) Provide revised Technical Specifications, and Drawings.

5) Update FAR 52.252-3, Alterations in Solicitation.

Amendment 0001: The purpose of Amendment 0001 to Solicitation W912P525BA001 is to incorporate the following changes:

1) Bidder Inquiry closing date is 14 February 2025.

2) Provide Sign-In Sheet from Pre-Proposal Site Visit.

3) Include Attachment: W912P5-25-B-A001 TPlans - Package A Q15-OHSSR-C-103 - 2025-01-30

The USACE, Nashville District (LRN) is acquiring a Design Bid Build (DBB) Construction Contract for the removal of an existing sewer treatment system and construction of a new sewer treatment system on the Lock side and the existing powerhouse side of Old Hickory Project Site. The work includes replacement of existing sanitary sewer lines, construction of new Polyethylene force main, construction of one (1) lift station in the left bank area of Old Hickory, construction of one (1) new lift station in the Old Hickory Powerhouse, construction of one (1) new jib crane in the power house for pump removal, and construction of one (1) flow meter in the new discharge line of the new lift station in the powerhouse. Please review the technical plans and specifications that will be provided upon request due to security categorization.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 9Viewing
Solicitation
Posted: Feb 19, 2025
Version 8
Solicitation
Posted: Feb 19, 2025
View
Version 7
Solicitation
Posted: Feb 11, 2025
View
Version 6
Solicitation
Posted: Jan 30, 2025
View
Version 5
Solicitation
Posted: Jan 23, 2025
View
Version 4
Solicitation
Posted: Jan 23, 2025
View
Version 3
Solicitation
Posted: Jan 23, 2025
View
Version 2
Pre-Solicitation
Posted: Jan 15, 2025
View
Version 1
Pre-Solicitation
Posted: Jan 7, 2025
View
OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT | GovScope