OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT

SOL #: W912P525BA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST NASHVILLE
NASHVILLE, TN, 37203-1070, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 7, 2025
2
Last Updated
Feb 19, 2025
3
Submission Deadline
Feb 24, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The USACE, Nashville District (LRN) is acquiring a Design Bid Build (DBB) Construction Contract for the removal of an existing sewer treatment system and construction of a new sewer treatment system on the Lock side and the existing powerhouse side of Old Hickory Project Site. The work includes replacement of existing sanitary sewer lines, construction of new Polyethylene force main, construction of one (1) lift station in the left bank area of Old Hickory, construction of one (1) new lift station in the Old Hickory Powerhouse, construction of one (1) new jib crane in the power house for pump removal, and construction of one (1) flow meter in the new discharge line of the new lift station in the powerhouse. Please review the technical plans and specifications that will be provided upon request due to security categorization.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 9
Solicitation
Posted: Feb 19, 2025
View
Version 8
Solicitation
Posted: Feb 19, 2025
View
Version 7
Solicitation
Posted: Feb 11, 2025
View
Version 6
Solicitation
Posted: Jan 30, 2025
View
Version 5
Solicitation
Posted: Jan 23, 2025
View
Version 4
Solicitation
Posted: Jan 23, 2025
View
Version 3Viewing
Solicitation
Posted: Jan 23, 2025
Version 2
Pre-Solicitation
Posted: Jan 15, 2025
View
Version 1
Pre-Solicitation
Posted: Jan 7, 2025
View