OLD HICKORY - SEWER SYSTEM REPLACEMENT AND BACKFLOW PREVENTER ASSEMBLY REPLACEMENT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The USACE, Nashville District (LRN) is acquiring a Design Bid Build (DBB) Construction Contract for the removal of an existing sewer treatment system and construction of a new sewer treatment system on the Lock side and the existing powerhouse side of Old Hickory Project Site. The work includes replacement of existing sanitary sewer lines, construction of new Polyethylene force main, construction of one (1) lift station in the left bank area of Old Hickory, construction of one (1) new lift station in the Old Hickory Powerhouse, construction of one (1) new jib crane in the power house for pump removal, and construction of one (1) flow meter in the new discharge line of the new lift station in the powerhouse. Please review the technical plans and specifications that will be provided upon request due to security categorization.