Z--OLYM Rehabilitate Log Cabin Drainfield
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), Department of the Interior, is soliciting proposals for the Rehabilitation of the Log Cabin Drainfield at Olympic National Park, Washington. This is a Total Small Business Set-Aside for a firm-fixed-price construction contract, estimated to be less than $25,000. The project involves repairing and restoring a subsurface drip drainfield. Quotes are due by April 22, 2026.
Scope of Work
The project's objective is to repair and restore Zone 1 of the Log Cabin Resort Geoflow subsurface drip drainfield to full operational capacity. This includes:
- Performing diagnostic, flushing, and repair procedures.
- Locating and hand-excavating dripline segment connections.
- Sequentially flushing segments to remove sediment and restore flow.
- Conditionally excavating and replacing up to two dripline segments if flushing is unsuccessful.
- Conducting full system operational testing and verifying automation, valve function, and dosing.
- Restoring all disturbed soils, piping, and structures to original elevations. Work must adhere to NPS regulations, environmental protection standards, and specific work hour limitations.
Contract Details
- Contract Type: Firm-Fixed-Price Construction Contract.
- Set-Aside: Total Small Business (NAICS 237110 - Water and Sewer Line and Related Structures Construction).
- Estimated Value: Less than $25,000.
- Period of Performance: Anticipated May 1, 2026, to June 1, 2026. Work must commence within 10 calendar days of award and be completed within 30 days.
- Bonds: Bid, Performance, and Payment Bonds are NOT REQUIRED. Liability Insurance is REQUIRED.
- SAM Registration: Offerors must have a current SAM.gov registration.
- Place of Performance: Olympic National Park, Port Angeles, WA.
Key Dates
- Published Date: March 19, 2026
- Questions Due: April 9, 2026, 1:00 PM PDT (submit to sue_mayo@nps.gov)
- Organized Site Visit: Tuesday, April 7, 2026, at 9:30 AM PDT. Interested vendors must RSVP to Kerri Cook (kerri_cook@nps.gov) by Monday, April 6, 2026, 3:00 PM PDT.
- Quotes Due: April 22, 2026, local time.
Submission & Evaluation
Quotes must be submitted via email to sue_mayo@nps.gov. Hard copies will not be accepted. Offerors must complete and sign boxes 15A-15C of Amendment 0001 and return it with their quote. Required submission elements include a pricing schedule (lump sum), contractor information, team composition, relevant experience, past performance, and a technical approach. A Department of Labor Wage Determination (WA20260022) for Clallam County, WA, applies. Evaluation Factors for Award: Price, Relevant Experience, Past Performance, Washington Contractor State License, and Technical Approach.