P683 Aircraft Engine Repair Facility, NAS Jacksonville, FL

SOL #: N6945026R0005Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHEAST
NAS JACKSONVILLE, FL, 32212-0030, United States

Place of Performance

Jacksonville, FL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 9, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM SOUTHEAST is soliciting proposals for a Design-Bid-Build (DBB) Firm-Fixed-Price (FFP) construction contract for the P683 Aircraft Engine Repair Facility at Naval Air Station (NAS) Jacksonville, Florida. This project, estimated between $250,000,000 and $500,000,000, involves the construction of a new engine repair facility and parking structure, alongside the demolition of existing buildings. Proposals are due June 09, 2026.

Scope of Work

This opportunity entails the construction of a new P683 Aircraft Engine Repair Facility to support Fleet Readiness Center (FRC) operations for the Joint Strike Fighter (JSF) engine. The project includes:

  • An approximately 300,000 GSF one-story high bay engine repair facility.
  • A 20,000 GSF two-story support/office and administration area.
  • A 300,000 GSF parking structure.
  • The facility will feature a steel-framed structure with precast concrete walls, a metal panel system, a modified bitumen roof, and shallow bearing foundations.
  • Built-in equipment such as cranes, an automated vertical storage system, and an elevator.
  • Demolition of two existing administration buildings (6F and 6G), for which a hazardous material survey has been conducted.
  • Associated site work, including two surface parking lots and intersection improvements.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Period of Performance: 1017 calendar days from initial contract award (anticipated Feb 1, 2027 - Sep 21, 2029).
  • Estimated Magnitude: Between $250,000,000 and $500,000,000.
  • Set-Aside: Unrestricted (Full and Open Competition).
  • NAICS Code: 236220, Commercial and Institutional Building Construction (Size Standard: $45,000,000).
  • DPAS Rating: DO-C2.
  • Cybersecurity: Cybersecurity Maturity Model Certification (CMMC) Level 1 (Self) is required.

Submission & Evaluation

  • Proposal Submission Deadline: June 09, 2026, at 03:00 PM local time.
  • Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) portal. Offerors must be registered in SAM.gov and PIEE.
  • Evaluation Factors: Proposals will be evaluated based on Price, Experience, Past Performance, Safety, Project Specific Requirements, and Small Business Utilization. A tradeoff process will be used.
  • Bonds: Performance and Payment Bonds are required.
  • Pre-Proposal Inquiries (PPIs): Due ten (10) calendar days prior to the closing date.

Key Updates & Attachments

  • Amendment 0002 (May 21, 2026): Updated numerous documents including the Geotechnical Exploration Report, Civil, Architectural, Electrical, HVAC, Plumbing, and Structural drawings/specifications. This amendment requires acknowledgment.
  • Amendment 0001 (May 15, 2026): Added FAR Clause 52.222-90 (DEI Discrimination), an Individual Small Business Subcontracting Plan Form (Attachment F), and updated instructions. The site visit roster from May 12, 2026, was also included. This amendment requires acknowledgment.
  • Geotechnical Report: Provides subsurface investigation findings and foundation recommendations for the new facility and parking garage.
  • Construction Schedule (Exhibit A): Outlines project milestones from anticipated contract award (Feb 1, 2027) to completion (Sep 21, 2029).

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: May 29, 2026
View
Version 7
Solicitation
Posted: May 21, 2026
View
Version 6Viewing
Solicitation
Posted: May 21, 2026
Version 5
Solicitation
Posted: May 20, 2026
View
Version 4
Solicitation
Posted: May 15, 2026
View
Version 3
Solicitation
Posted: Apr 29, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 15, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 10, 2026
View