Paint Interior Walls-F336, Child Development Center (CDC), Vance ABF

SOL #: FP1021202Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3029 71 FTW CVC
ENID, OK, 73705-5037, United States

Place of Performance

Enid, OK

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 10, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (USAF), specifically Vance AFB, is soliciting Firm-Fixed-Price (FFP) proposals for wallpaper removal and interior painting services at Facility 336, Child Development Center (CDC) in Enid, Oklahoma. This is a combined synopsis/solicitation, and award is contingent upon the availability of funds. Proposals are due by June 10, 2026, at 1:00 PM CST.

Scope of Work

The contractor will provide all labor, equipment, materials, tools, supervision, and transportation for the project. Key tasks include:

  • Complete removal of existing wallpaper, adhesive, and wall base.
  • Surface preparation, including repairing dents and holes.
  • Application of a "Knockdown" texture to match existing surfaces.
  • Application of a minimum of two coats of "Mindful Gray" paint with an "Eggshell" finish.
  • Protection of fixtures, doors, windows, and sensors during work.
  • Installation of new 4-inch black rubber cove base.
  • Reinstallation of all previously removed safety-mounted equipment and site restoration to pre-construction conditions.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation, Firm-Fixed-Price (FFP)
  • Duration: 80 calendar days total (45 non-performance, 35 work performance).
  • Set-Aside: None specified.
  • Proposal Due: June 10, 2026, 1:00 PM CST.
  • Published: May 20, 2026.
  • Quote Validity: Proposals must remain valid through September 30, 2026.

Key Requirements & Instructions

  • Funding Contingency: Award is dependent on the availability of funds.
  • Work Hours: Work is strictly limited to weekends: Friday 6:00 PM through Monday 4:00 AM.
  • Site Visit: A site visit was held on May 18, 2026, at 1:00 PM CST. Contractors must comply with Vance AFB access requirements, including Real ID compliant identification.
  • Questions: Submit all questions using the provided Q&A form to Betty Kliewer (betty.kliewer.ctr@us.af.mil) by June 4, 2026. Responses will be issued via amendment on SAM.gov.
  • Submission: Proposals must be submitted electronically to Betty Kliewer by the deadline. Offerors must complete Appendix B - bid form.
  • Materials: Sherwin Williams brand paint or approved equivalent, Low-VOC or Zero-VOC, highly durable/washable, and must meet the Buy American Act.
  • Labor: Adherence to the U.S. Department of Labor Wage Determination (Revision No. 18, dated 12/03/2025) for Oklahoma County, OK, including specified minimum wage rates and fringe benefits.
  • Registration: All bidders must be actively registered in SAM.gov at the time of proposal submission and award.

Attachments

  • Statement of Work (SOW)
  • Wage Determination
  • Q&A form
  • Vendor Information
  • Site Visit Sign-in Sheet
  • Vendor Authorization Request Template

People

Points of Contact

Vance Local PurchaseSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026
View