Paint Interior Walls-F336, Child Development Center (CDC), Vance ABF

SOL #: FP1021202Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3029 71 FTW CVC
ENID, OK, 73705-5037, United States

Place of Performance

Enid, OK

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 10, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

ASRC Federal Gulf State Constructors, on behalf of Vance Air Force Base, is soliciting proposals for interior wall painting services for Facility 336, Child Development Center (CDC), at Vance AFB, Enid, Oklahoma. This is a Firm-Fixed-Price (FFP) requirement for the removal of wallpaper and painting, including surface preparation, texture application, and new wall base installation. Proposals are due June 10, 2026, at 1:00 PM CST.

Scope of Work

The project, detailed in the Statement of Work (SOW) FP1021202, involves:

  • Demolition: Complete removal of existing wallpaper, adhesive, and wall base.
  • Painting: Preparation of all surfaces, application of "Knockdown" texture, and a minimum of two coats of "Mindful Gray" paint with an "Eggshell" finish. Protection of fixtures and site restoration are required.
  • Wall Base Installation: Installation of new 4-inch black rubber cove base.
  • Reinstallation: Secure reinstallation of all removed safety-mounted equipment.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (FFP)
  • Set-Aside: None specified
  • Place of Performance: Facility 336, Vance AFB, Enid, OK 73705
  • Project Duration: 80 calendar days total (45 non-performance, 35 work performance).
  • Work Hours: Strictly limited to weekends (Friday 6:00 PM through Monday 4:00 AM).
  • Site Visit: A site visit was held on May 18, 2026, at 1:00 PM CST.
  • Questions Due: June 4, 2026 (submit via provided Q&A form).
  • Proposals Due: June 10, 2026, 1:00 PM CST.
  • Quote Validity: Proposals must remain valid through September 30, 2026, due to anticipated funding schedules.

Key Requirements & Conditions

  • Funding: Award is contingent upon the availability of funds; the requirement is currently unfunded.
  • Materials: Sherwin Williams brand paint (or approved equivalent) is required, with Low-VOC or Zero-VOC, highly durable/washable specifications. All materials must meet the Buy American Act.
  • Personnel: Contractor employees must comply with Installation Security Requirements. A Superintendent and Quality Control representative are required.
  • Wage Determination: Bidders must adhere to the U.S. Department of Labor Wage Determination (Revision No. 18, dated 12/03/2025) for Oklahoma County, Oklahoma, which specifies minimum wage rates and fringe benefits.
  • Registration: All bidders must be actively registered in SAM.gov at the time of proposal submission and award.
  • Submission: Submit proposals electronically to Betty Kliewer (betty.kliewer.ctr@us.af.mil).

Amendments

  • Amendment 4: Provided answers to submitted questions.
  • Amendment 3: Extended the required quote validity period to 180 days from the closing date.
  • Amendment 2: Attached the site visit sign-in sheet.
  • Amendment 1: Scheduled the site visit for May 18, 2026.

Attachments

Key attachments include the Statement of Work, Wage Determination, Q&A form, and Vendor Information (including a Vendor Authorization Request Template for ASRC Federal).

People

Points of Contact

Vance Local PurchaseSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026
View