PAX RIVER FSS Rewrite
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Department of Navy, Naval Facilities Engineering Command (NAVFAC) Washington is interested in gaining knowledge of potential qualified Small Business firms capable of performing the following work:
Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Air Station, Patuxent River, Webster Field Annex, St Inigoes, and Solomon’s Maryland and outlying areas supported by this installation performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.