Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam

SOL #: W911WN26BA003Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST PITTSBURGH
PITTSBURGH, PA, 15222-4198, United States

Place of Performance

Wheeling, WV

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Maintenance Of Dams (Z1KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Jan 21, 2026
3
Submission Deadline
Jan 21, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete. 6 January 2026 - Amendment 0001 posted to 1) update Attachment 4 - Wage Determination OH20250001 9-26-2025 to OH20260001 1-2-2-026, 2) update Attachment 5 - Wage Determination WV20250073 6-6-2026 to WV20260073 1-2-2026, 3) reopen ProjNet for questions from 6 January 2026 to close of business on 9 January 2026, and 4) extend the solicitation from 11:00 AM ET, 13 January 2026 to 11:00 AM ET, 16 January 2026.   15 January 2026 - Amendment 0002 posted to 1) update Section 00 45 00 to Attachment 1 - Specifications based upon ProjNet questions, 2) update Plan Sheet S-510 of Attachment 2 - Plans, 3) add Reference Drawing S-1001-Z to Attachment 2 - Plans, and 4) extend the solicitation from 11:00 AM ET, 16 January 2026 to 11:00AM ET, 21 January 2026.     NOTE:  Due to a system error in PIEE, this Solicitation did not transfer from a pre-solicitation to a solicitation.  This issue has been resolved, and contractors can now submit their bids via PIEE. These updates prompted changes in SAM.gov that do not affect the solicitation and were necessary to synchronize SAM.gov to PIEE.      

21 January 2026 - Bid opening held, bid results posted.      

People

Points of Contact

Files

Files

Download
View
Download
Download
View

Versions

Version 7Viewing
Solicitation
Posted: Jan 21, 2026
Version 6
Solicitation
Posted: Jan 15, 2026
View
Version 5
Solicitation
Posted: Jan 15, 2026
View
Version 4
Solicitation
Posted: Jan 15, 2026
View
Version 3
Solicitation
Posted: Jan 6, 2026
View
Version 2
Solicitation
Posted: Dec 19, 2025
View
Version 1
Solicitation
Posted: Dec 10, 2025
View
Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam | GovScope