PLC PANEL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting bids for a PLC PANEL. This is a Solicitation for Electrical Control Equipment (PSC 6110). The solicitation has been amended to extend the response date to March 16, 2026.
Scope of Work
This opportunity requires the manufacture and supply of a PLC PANEL according to specified design, Cage Code/Reference Number items, and marking requirements (MIL-STD-130). The contractor is responsible for all inspection requirements, and packaging must comply with MIL-STD 2073. Accelerated delivery is encouraged, and all freight is FOB Origin. The resultant award will be issued bilaterally, requiring the contractor's written acceptance.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Response Due: March 16, 2026, 8:30 PM UTC
- Published: February 19, 2026
- Amendments: The solicitation close date was extended to March 16, 2026. An option for a 100%, 365-day period was added to subClin 0001AA.
Key Requirements & Notes
- Traceability: Offerors not the manufacturer must provide a letter/official email from the OEM confirming authorized distributorship.
- Design Changes: Specific procedures and codes (1-6) are outlined for handling changes in design, material, servicing, or part numbers, with most requiring PCO approval.
- Quality Assurance: The contractor is responsible for all inspection requirements, and Government source inspection is mandatory. Records of inspection work must be kept for 365 days after final delivery.
- Documentation: Detailed instructions are provided for obtaining applicable documents, including military specifications and standards, and information on handling "Official Use Only" and "NOFORN" documents.
- Distribution Statements: Contractors must adhere to U.S. Navy distribution statements (A-X) for provided documents and drawings, which define limits of distribution and safeguarding information.