PR Data Cabling Project

SOL #: 205AE9-26-Q-00010Combined Synopsis/Solicitation

Overview

Buyer

Treasury
Internal Revenue Service
IT STRATEGY AND MODERNIZATION
Washington, DC, 20224, United States

Place of Performance

Guaynabo, PR

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 2, 2026
2
Last Updated
Mar 4, 2026
3
Submission Deadline
Mar 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Internal Revenue Service (IRS) is soliciting quotes for a PR Data Cabling Project to upgrade data cabling at IRS Building PR4001, City View Plaza in Guaynabo, Puerto Rico. This Total Small Business Set-Aside opportunity aims to enhance operational efficiency and compliance through comprehensive cable plant modernization. Quotes are due by Wednesday, March 5, 2026, at 12:00 PM EST.

Scope of Work

The project involves a complete upgrade of the data cabling infrastructure. Key requirements include:

  • Cable Plant Planning & Design: Review, selection, and procurement of components, development of installation designs and specifications.
  • Installation: Installation of approximately 300 CAT 6A cable drops and 6 new data drops at the 5th Floor IDF Room.
  • Network Rack Refresh: Organization and refresh of MDF network equipment racks, including new patch panels, slim patch cords, cable management, and 6 new PDUs.
  • Testing & Documentation: Detailed testing and documentation of all installed systems.
  • Compliance: Adherence to industry standards (e.g., ANSI/TIA/EIA-568-C.2, ANSI/TIA-942, BICSI 002) and IRS compliance requirements for network rooms, including fire-stopping measures.
  • Warranty: Provision of a 1-year workmanship warranty and a 25-year material warranty.
  • Legacy Equipment: Contractor is responsible for the removal and disposal of existing legacy cabling.

Contract Details

  • Contract Type: Firm-Fixed Price (implied).
  • Period of Performance: Date of Award – June 30, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210, Electrical Contractors and Other Wiring Installation Contractors, with a $19 Million size standard.
  • Place of Performance: Guaynabo, PR.

Submission & Evaluation

  • Quotation Submission Deadline: Wednesday, March 5, 2026, at 12:00 PM EST.
  • Submission Method: Email price quotes to Nakia Barriteau at Nakia.R.Barriteau@irs.gov.
  • Required Documents: Cover letter, technical quote (maximum 10 pages), and price quote with supporting documents.
  • Evaluation Criteria: Award will be made to the responsible offeror with the lowest evaluated price who meets all technical requirements.
  • Questions Deadline: The deadline for questions was Tuesday, February 10, 2026, at 12:00 PM Eastern.

Additional Notes

  • Offerors must be registered and have an active record in the System for Award Management (SAM) at www.sam.gov.
  • Contractor personnel will be escorted by IRS personnel; no specific security clearance is required for unescorted access.
  • Site visits are not possible. Floor plans ("City View-Data Drop Floor Plan") will be provided.
  • "Brand name or equal" to Panduit CAT6A cables is acceptable. Secure material staging space is available.

People

Points of Contact

Nakia BarriteauPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 10, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 4, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View