Propulsion System Rocket Engine (PSRE) Transport Trailer 2 (PTT2)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (AFNWC/NIMT) is conducting market research to identify qualified contractors for the Propulsion System Rocket Engine (PSRE) Transport Trailer 2 (PTT2) program. This effort seeks a form, fit, and function replacement for the legacy fleet supporting the Minuteman III (MMIII) ICBM weapon system. Responses are due January 31, 2025.
Scope of Work
The Air Force requires a new design and Technical Data Package (TDP) to address parts obsolescence and scarcity in the existing fleet. The PTT2 must provide:
- Protection and Transportation: Secure transport of PSREs within shipping containers to various operational locations.
- Environmental Control: An on-board diesel-fueled generator and closed-loop HVAC system to maintain required temperature ranges.
- Mechanical Protection: A platform designed to limit excessive shock and vibration during transit.
- Phased Procurement: The AF anticipates procuring five units total: 1–2 units during the Engineering, Manufacturing, and Development (EMD) phase and 3–4 units during Production.
Contract & Timeline
- Type: Sources Sought / Market Research
- NAICS Codes: 336212 or 336999 (Size standard: 1,000 employees)
- Set-Aside: None specified; research will determine if a Small Business Set-Aside is appropriate.
- Response Due: January 31, 2025
- Published: February 10, 2026 (Updated with Industry Day reports and Q&A)
Submission Requirements
Interested parties must submit a 10-page capability statement using the provided "PTT2 Response Template." Responses should detail risk mitigation strategies, long-lead item management, manufacturing experience, and Rough Order of Magnitude (ROM) cost estimates for design, testing, and production.
Eligibility & Access
Distribution of the Statement of Work (SOW) and System Requirements Document (SRD) is restricted. Contractors must possess a DD 2345 certification via the Joint Certification Program to access these documents.
Additional Notes
This is a new design and manufacturing effort; there is no incumbent contractor. Recent updates include the addition of Industry Day reports and Q&A documents as of January 2026.