Propulsion System Rocket Engine (PSRE) Transport Trailer 2 (PTT2)

SOL #: FA8214PTT2Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8214 AFNWC PZBB
HILL AFB, UT, 84056-5837, United States

Place of Performance

Hill AFB, UT

NAICS

Industrial Truck (333924)

PSC

Trailers (2330)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 16, 2025
2
Last Updated
Mar 9, 2026
3
Response Deadline
Sep 1, 2025, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, Air Force Materiel Command (AFNWC/NIMT) is conducting market research through a Request for Information (RFI) for the Propulsion System Rocket Engine (PSRE) Transport Trailer 2 (PTT2) program. This effort aims to identify potential contractors capable of developing a new design, creating a new Technical Data Package (TDP), and manufacturing a replacement for the obsolete PTT fleet supporting the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM). The Air Force plans to procure five PTT2s. Responses are due by March 24, 2026.

Scope of Work

The PTT2 is a specialized trailer designed for the protection and transportation of PSREs housed within a PSRE Shipping Container. It must limit excessive shock and vibration and provide a temperature-controlled environment using an on-board diesel-fueled generator and a closed-loop Heating, Ventilation, and Air Conditioning (HVAC) unit. The program seeks a form, fit, and function replacement to address parts obsolescence and scarcity, and to increase the overall PTT fleet.

Information Sought

This RFI, now in its third round, specifically requests:

  • A detailed overview of the company's sub-contractor management plan, addressing requirement compliance, performance management, quality oversight for specialized work (e.g., welding), and technical integration across sub-contractors.
  • The company's position on including a clause for government communication, audit rights, facility visits, and oversight/approval of sub-contractor events (e.g., Preliminary Design Review), if planning to sub-contract more than 20% of the work.

Contract & Timeline

  • Type: Sources Sought / Market Research (RFI)
  • Potential Set-Aside: The Government is exploring a total Small Business Set-Aside and is interested in all small business types (8(a), SDVOSB, Hubzone, WOSB).
  • NAICS Codes: 336212 (Motor Vehicle Body Manufacturing) or 336999 (All Other Transportation Equipment Manufacturing), both with a 1,000-employee size standard.
  • Response Due: March 24, 2026, at 22:30 UTC.
  • Published: March 9, 2026.
  • Place of Performance: Nibley, UT.

Eligibility & Submission

Access to the PTT2 Statement of Work (SOW) and System Requirements Document (SRD) is limited to contractors with a DD 2345 certification from the Defense Logistics Information Service, Joint Certification Program. Interested parties must submit a white-paper capability statement (limited to 2 pages) thoroughly answering the RFI questions. Submissions should include company details, CAGE Code, Unique Identifier, business size, small business type(s), recommendations/comments, point of contact, and web page URL. Email responses to kyle.andersen@us.af.mil and torrey.boggs.2@us.af.mil.

Additional Notes

This RFI is for informational and planning purposes only and does not constitute a solicitation or commitment to award a contract. No funds are available for RFI responses. This is a new design and manufacturing effort, not a service, and there is no incumbent contractor for this specific acquisition.

People

Points of Contact

Torrey BoggsPRIMARY
Kyle AndersenSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 13
Sources Sought
Posted: Mar 9, 2026
View
Version 12
Sources Sought
Posted: Feb 10, 2026
View
Version 11
Sources Sought
Posted: Jan 21, 2026
View
Version 10
Sources Sought
Posted: Dec 17, 2025
View
Version 9
Sources Sought
Posted: Nov 25, 2025
View
Version 8
Sources Sought
Posted: Nov 25, 2025
View
Version 7
Sources Sought
Posted: Sep 23, 2025
View
Version 6
Sources Sought
Posted: Sep 19, 2025
View
Version 5
Sources Sought
Posted: Sep 19, 2025
View
Version 4
Sources Sought
Posted: Sep 19, 2025
View
Version 3
Sources Sought
Posted: Aug 7, 2025
View
Version 2Viewing
Sources Sought
Posted: Jul 23, 2025
Version 1
Sources Sought
Posted: Jul 16, 2025
View