Propulsor Duct Machining

SOL #: N0016725R0005Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NSWC CARDEROCK
BETHESDA, MD, 20817-5700, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Ship And Boat Propulsion Components (2010)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 22, 2025
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Apr 2, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Naval Surface Warfare Center, Carderock Division (NSWCCD), specifically the Advanced Propulsor Management Office (APMO, Code 808), is soliciting for Propulsor Duct Machining services. This opportunity, identified as Solicitation N0016725R0005, supports the Research and Development (R&D), design, testing, acquisition, and delivery of United States Navy submarine propulsors. The resultant contract will be a combination of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP).

Scope of Work

The contractor will be responsible for propulsor duct machining. Key clarifications from Amendment 1 indicate that the pre-HYSHMA paint scope for COLUMBIA AOS and Chemlok primer installation are no longer within scope. Access to classified information requires a DD254 on file. Government Furnished Material (GFM) casting for VCS is estimated for February 26, 2026, and for CLB in April 27, 2026. A CLIN for cost-only travel bids will be provided.

Key Deliverables & Requirements

The contract includes numerous Contract Data Requirements Lists (CDRLs):

  • A001 VCS Propulsor Duct Manufacturing Plan: A detailed plan for manufacturing.
  • A002 Inspection and Test Plan: Required 30 days after contract award.
  • A003 Packaging Plan: For preservation and shipping, adhering to MIL-STD-2073-1E.
  • A004 Welding Procedures: Must conform to MIL-STD-278F, 1688, 1689.
  • A005 Welding Procedure Qualification Test Report: Also conforming to MIL-STD-278F, 1688, 1689.
  • A006 Conference Agenda & A007 Conference Minutes: Required for scheduled meetings.
  • A008 Weekly Status Report: Comprehensive report on progress, CCRs, shipments, and tasking.
  • A009 Project Planning Chart: Monthly submission in Microsoft Project format.
  • A010 Request for Variance (VACCS): For non-conforming material.
  • A011 Certification/Data Report: For data previously submitted under other contracts. Many documents, including drawings, are subject to Distribution Statement D, limiting access to DOD and DOD contractors due to critical technology and export restrictions.

Contract & Timeline

  • Contract Type: Combination of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP).
  • Product Service Code: 2010 (Ship And Boat Propulsion Components).
  • Set-Aside: None specified.
  • Solicitation Published: February 18, 2026.
  • Response Date: April 2, 2026.
  • Amendments: Amendment 1 has been issued to incorporate clarifications and corrections, including an extension of 30 days from the date of misalignment correction.

Contact Information

For inquiries, contact Jonathan Mauro at jonathan.s.mauro.civ@us.navy.mil or 301-385-5415, or Sam Keith at sam.a.keith.civ@us.navy.mil or 301-227-2357.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 11
Solicitation
Posted: Mar 13, 2026
View
Version 10
Solicitation
Posted: Mar 4, 2026
View
Version 9Viewing
Solicitation
Posted: Feb 18, 2026
Version 8
Solicitation
Posted: Feb 12, 2026
View
Version 7
Solicitation
Posted: Dec 19, 2025
View
Version 6
Solicitation
Posted: Dec 3, 2025
View
Version 5
Solicitation
Posted: Dec 1, 2025
View
Version 4
Solicitation
Posted: Nov 21, 2025
View
Version 3
Solicitation
Posted: Oct 16, 2025
View
Version 2
Solicitation
Posted: Sep 22, 2025
View
Version 1
Solicitation
Posted: Sep 22, 2025
View