Propulsor Duct Machining
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically the Naval Surface Warfare Center, Carderock Division (NSWCCD), is soliciting proposals for Propulsor Duct Machining (Solicitation N0016725R0005). This contract will support the Advanced Propulsor Management Office (APMO, Code 808) in managing the Research and Development (R&D), design, testing, acquisition, and delivery of United States Navy submarine propulsors. The resultant contract will be a combination of Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP). Proposals are due May 7, 2026, at 5:00 PM ET.
Scope of Work
The opportunity focuses on the acquisition of Propulsor Duct Machining. Key aspects include:
- Machining of propulsor ducts for US Navy submarines.
- Management of R&D, design, testing, acquisition, and delivery of propulsors.
- Government Furnished Material (GFM) castings are anticipated to be available around February 26, 2026 (VCS) and April 27, 2026 (CLB). Castings are expected to weigh between 60,000 – 70,000 lbs with approximately 0.125” of excess on all surfaces.
- The pre-HYSHMA paint scope for COLUMBIA AOS and Chemlok primer installation have been removed from the solicitation.
- Access and storage of classified information require a DD254 on file.
Contract & Timeline
- Type: Combination Cost-Plus-Fixed-Fee (CPFF) and Firm-Fixed-Price (FFP)
- Solicitation Number: N0016725R0005
- Set-Aside: None specified
- Product Service Code: 2010 (Ship And Boat Propulsion Components)
- Response Date: May 7, 2026, 5:00 PM ET
- Published Date: April 27, 2026
Key Deliverables (CDRLs)
The contract requires several data deliverables, including:
- A001 VCS Propulsor Duct Manufacturing Plan: Electronic submission via DoD SAFE.
- A002 Inspection and Test Plan: Draft due 30 days after contract award, subject to government approval.
- A003 Packaging, Preservation, and Shipping Plan: Must conform to MIL-STD-2073-1E.
- A004 Welding Procedures: Must conform to MIL-STD-278F, 1688, 1689; drafts due 60 days before approval.
- A005 Welding Procedure Qualification Test Report: Conformance to MIL-STD-278F, 1688, 1689.
- A006 Conference Agenda: Due 5 working days prior to meetings.
- A007 Conference Minutes: Due 5 working days after meetings.
- A008 Weekly Status Report: Weekly submission, including status of CCRs, DD250s, shipments, and tasking dates.
- A009 Project Planning Chart: Monthly submission in Microsoft Project format.
- A010 Request for Variance (VACCS): For alternate configurations of non-conforming material.
- A011 Submission of Data Issued Under Prior Contract: Requires OQE to verify data. All CDRLs have distribution limitations (DOD and DOD contractors only) and export restrictions.
Clarifications and Updates
- Amendment 1 has clarified attachment references, corrected headers, and provided missing drawings.
- A Contract Line Item Number (CLIN) will be provided for contractors to bid cost-only travel.
- As-cast condition sketches are unavailable.
- Applicable CCRs are available via VIRGINIA Class Configuration Control System (VACCS) upon request; PERs will be uploaded with Q&A responses.