PUMP,CENTRIFUGAL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting quotes for the repair of PUMP,CENTRIFUGAL (PSC 4320). This Request for Quote (RFQ) is issued under Emergency Acquisition Flexibilities (EAF), encouraging accelerated delivery. Key requirements include a 285-day Repair Turnaround Time (RTAT) and Government Source Inspection (GSI). Quotes are due February 6, 2026.
Scope of Work
This opportunity covers the repair and quality assurance requirements for the PUMP,CENTRIFUGAL (CAGE 63857, Ref. No. 5-DBVB-21). Contractors must perform all repair work according to their standard practices, manuals, and directives, ensuring the item meets operational and functional requirements. Marking must comply with MIL-STD-130, REV N, and packaging with MIL-STD 2073. Any design or material changes require prior approval from the NAVICP-MECH Contracting Officer. The contractor is responsible for all inspections and testing as per original manufacturer specifications.
Contract & Timeline
- Type: Solicitation (RFQ) for repair services. The resultant award will be bilateral, requiring contractor acceptance.
- Set-Aside: None specified.
- Response Due: February 6, 2026, 8:30 PM EST.
- Published: January 6, 2026.
- Freight: FOB Origin, with handling by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
- The Government intends to include an option for increased quantity.
Submission Requirements
Quotes must detail Unit Price, Total Price, and the proposed Repair Turnaround Time (RTAT) in days. If the proposed RTAT exceeds the Government's required 285 days, offerors must provide capacity constraints. Bidders should specify if their pricing is Firm-fixed-Price, Estimated, or Not-to Exceed (NTE). A T&E fee/price for assets determined Beyond Repair (BR/BER) should also be included. Only authorized distributors of the original manufacturer's item will be considered, and proof on company letterhead is required.
Additional Notes
Failure to meet the required RTAT will incur a price reduction per unit per month, up to a specified maximum, unless delays are excusable. Offerors must verify nomenclature, part number, and NSN before responding.