PUMP,CENTRIFUGAL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mechanicsburg, is soliciting quotes for the repair of PUMP,CENTRIFUGAL units. This Solicitation requires a Repair Turnaround Time (RTAT) of 285 days and includes Government Source Inspection (GSI). Quotes are due by March 6, 2026.
Scope of Work
This opportunity covers the repair and quality assurance requirements for PUMP,CENTRIFUGAL units (CAGE 63857, Ref. No. 5-DBVB-21). Repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Items must meet operational and functional requirements and be marked in accordance with MIL-STD-130, REV N. The contractor is responsible for all inspection and testing, ensuring compliance with original manufacturer specifications.
Contract & Timeline
- Type: Solicitation (RFQ for repair, resultant award will be bilateral)
- Set-Aside: None specified
- Response Due: March 6, 2026, 8:30 PM ET
- Published: February 9, 2026
- Delivery: Accelerated delivery is encouraged. RTAT is 285 days from asset return to acceptance.
- Option: The Government intends to add an option quantity for increased supplies.
Submission Requirements
Quotes must include:
- Quote Amount and RTAT: Unit Price, Total Price, and proposed RTAT (in days).
- T&E Fee: If an asset is determined Beyond Repair (BR/BER), provide a T&E fee/price and its computation basis.
- Awardee Information: CAGE codes for awardee, inspection/acceptance, and facility/subcontractor.
- Comparison Data: New unit price and new unit delivery lead-time.
- Price Reduction: State the price reduction amount per unit/per month for unexcusable RTAT delays, up to a maximum.
- Capacity Constraints: If not meeting the required RTAT, provide capacity constraints.
Special Conditions
- Authorized Distributors: Only authorized distributors of the original manufacturer's item will be considered. Proof on company letterhead, signed by a responsible official, must accompany the offer.
- Price Reduction for Delays: A price reduction will be incurred for unexcusable delays in meeting the required RTAT.
- Freight: FOB Origin, but handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work.
Contact Information
For inquiries, contact ALISON.E.HARPER.CIV@US.NAVY.MIL or 7712290456.