Pumped Pretreated Waste System Vault Upgrade Project – Ames, IA

SOL #: 1232SA26Q0470Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Ames, IA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Sewage And Waste Facilities (Z2ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 20, 2026
2
Submission Deadline
May 12, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Agricultural Research Service is soliciting proposals for the Pumped Pretreated Waste System Vault Upgrade Project at its campus in Ames, IA. This Total Small Business Set-Aside opportunity requires replacing existing carbon steel piping with stainless steel, installing new stainless steel valves, and insulating all piping within PPW Vaults 101B, 103, and 105. The acquisition is a Request for Quotation (RFQ) under FAR Part 12, with award based on the Lowest Priced Technically Acceptable (LPTA) criteria. Proposals are due May 12, 2026.

Scope of Work

  • Vault Upgrades: Replace all carbon steel piping components within PPW Vaults 101B, 103, and 105 with stainless steel components.
  • Valve Replacement: Replace all existing valves with new stainless steel, full-port ball valves.
  • Insulation: Insulate all new stainless steel piping within the vaults.
  • Contractor Responsibilities: Provide all labor, materials, equipment, hardware, transportation, storage, and disposal of existing components.
  • Performance Standards: Utilize prefabrication of spools to minimize shutdown times (maximum 8 hours per line, with 5 hours for contractor work). All work must be coordinated with the Contracting Officer's Representative (COR) and performed when outside temperatures are above 45°F. Compliance with applicable regulatory requirements (ASTM, OSHA, SSPC, NFPA, UL) and ASME B31.3 Process Piping Code is mandatory.
  • Site Verification: Contractors are highly encouraged to visit the site for exact measurements and to ascertain the nature of the work.

Contract Details

  • Type: Firm Fixed-Price (RFQ)
  • Period of Performance: 365 days after award.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction)
  • Size Standard: $45M
  • Place of Performance: USDA Campus, 1920 Dayton Avenue, Ames, IA 50010

Submission & Evaluation

  • Submission Deadline: May 12, 2026, by 5:00 PM Central Time.
  • Questions Due: April 30, 2026, by 12:00 PM Central Time.
  • Submission Method: Email to david.hildebrand@usda.gov with the subject line "RFQ 1232SA26Q0470".
  • Evaluation Criteria: Lowest Priced Technically Acceptable (LPTA).
  • Required Submittals: Fully completed and signed SF 1442, acknowledgement of all amendments, executed SF 24 Bid Bond (not less than 20% of proposed price, not to exceed $300,000), two recent and relevant experience references, and CPARS ratings (if applicable).
  • Eligibility: Offerors must be registered with SAM.gov and have an active registration at the time of quote submission.

Key Attachments

  • Statement of Work (SOW)
  • Detailed Specifications for PPW piping and welding
  • Wage Determination IA20260003 (Davis-Bacon Act compliance)
  • Drawings for PPW Vaults 101B, 103, and 105

People

Points of Contact

David HildebrandPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Pumped Pretreated Waste System Vault Upgrade Project – Ames, IA | GovScope