Purchase, Removal and Installation of a 100kw Propane Generator
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Agriculture (USDA) Forest Service is soliciting quotes for the purchase, removal, and installation of a 100kw propane generator at the Bude Work Center in Meadville, MS. This project involves replacing an aging unit with a new, high-capacity gaseous generator to ensure facility power reliability. Quotes are due by February 6, 2026.
Scope of Work
The contractor shall provide all labor, materials, and equipment to:
- Remove and dispose of the existing Generac 100kw generator (Model QT10068AVAC) off Forest Service property.
- Install a new 100kw propane generator (specified as a Generac RG10090AVAC or a comparable unit from Kohler, Caterpillar, or Cummins).
- Connect to existing infrastructure, including the on-site 1000-gallon liquid propane tank and the existing ASCO 600-amp transfer switch.
- Perform site cleanup and ensure the system is fully operational.
Contract & Timeline
- Type: Firm Fixed-Price Purchase Order
- Set-Aside: Total Small Business Set-Aside
- Period of Performance: February 2, 2026, to September 30, 2026
- Response Due: February 6, 2026, at 4:00 PM CT
- Place of Performance: Bude Work Center, Meadville, MS
Evaluation
Award will be made to the offeror providing the Lowest Price Technically Acceptable (LPTA) quotation. Evaluation factors include:
- Technical Approach: Ability to meet specifications and provide a sound schedule.
- Price: Evaluated for fairness and reasonableness.
- Past Performance: Assessed via references and government databases.
Additional Notes
Amendments have clarified that while a specific Generac model was originally named, comparable 100kW units are acceptable. Site visits are highly encouraged and can be scheduled by contacting Jasin Wesberry at 601-300-1171.