Quemado Lake Well Repair Gila National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Department of Agriculture (USDA) Forest Service is soliciting quotes for the Quemado Lake Well Repair project within the Gila National Forest, NM. This project aims to restore full water functionality to the recreation site before its scheduled opening on May 10, 2026. Quotes are due by February 13, 2026.
Scope of Work
The contractor shall provide all labor, equipment, and materials to:
- Well Repair: Remove and replace the failed well pump system with a new 1.5hp, 5 GPM Goulds submersible pump and motor assembly, including a compatible control box and PumpTec Plus protection device.
- Electrical & Testing: Install new hardware, complete electrical connections, and perform comprehensive testing to ensure system functionality.
- Roadway Rehabilitation: Perform minor maintenance on approximately 250-300 linear feet of unsurfaced access route (clearing vegetation and regrading) to allow safe equipment transport.
- Compliance: Ensure all work meets federal, state, and local regulations, providing as-built documentation and well logs upon completion.
Contract & Timeline
- Type: Firm-Fixed Price (FFP)
- Set-Aside: 100% Small Business
- Period of Performance: March 2, 2026 – April 1, 2026
- Questions Due: February 6, 2026, at 1700 MST
- Quotes Due: February 13, 2026, at 1700 MST
Evaluation
Award will be based on a Best Value Tradeoff considering:
- Technical Approach (Most Important): Methodology for well/road repair, schedule, and key personnel qualifications.
- Past Performance: Evaluation of up to three relevant projects from the last five years.
- Price: Evaluated for reasonableness and realism. Non-price factors, when combined, are significantly more important than price.
Additional Notes
Amendment 0001 clarified specific pump specifications and the extent of road maintenance. Timely completion is mandatory to avoid delaying the recreation site's seasonal opening.