Quemado Lake Well Repair Gila National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Department of Agriculture (USDA), Forest Service, has issued a combined synopsis/solicitation for the repair of the existing well system at the Quemado Lake Recreation Site within the Gila National Forest, NM. This project is critical to restoring water functionality before the site's scheduled opening on May 10, 2026. Quotes are due by February 13, 2026.
Scope of Work
The contractor shall provide all labor, equipment, and materials to restore the well to full operation. Key tasks include:
- Well Repair: Removal and replacement of failed components, specifically installing a new 1.5hp, 5 GPM submersible pump and motor assembly, a compatible control box, and a protection device.
- Electrical & Testing: Completing electrical connections from the pump house (50-70 feet away) and performing system testing.
- Road Rehabilitation: Performing minor maintenance on approximately 250-300 linear feet of unsurfaced access route to allow safe equipment transport.
- Compliance: Ensuring all work meets federal, state, and local regulations, including the submission of well logs and as-built documentation.
Contract & Timeline
- Contract Type: Firm-Fixed Price
- Set-Aside: 100% Total Small Business
- Period of Performance: March 2, 2026 – April 1, 2026
- Response Deadline: February 13, 2026, at 1700 MST
- NAICS Code: 221310 (Water Supply and Irrigation Systems)
Evaluation
Award will be made on a Best Value Tradeoff basis. Evaluation factors include:
- Technical Approach: Methodology for well/road repair, project schedule, and key personnel qualifications (Most Important).
- Past Performance: Review of up to three relevant projects from the last five years.
- Price: Evaluated for reasonableness and realism. Non-price factors, when combined, are significantly more important than price.
Additional Notes
Amendment 0001 provided critical technical clarifications regarding pump specifications and electrical conduit locations. Timely completion is mandatory to avoid delaying the public opening of the recreation site.