Reconfigure/Refurbish the Training Room and Office Building for USCG in Buchanan, TN
SOL #: 70Z02926QNEWO003Combined Synopsis/Solicitation
Overview
Buyer
Homeland Security
Us Coast Guard
BASE NEW ORLEANS(00029)
NEW ORLEANS, LA, 70117, United States
Place of Performance
Buchanan, TN
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Office Buildings (Z2AA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 20, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 29, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) is soliciting proposals for the reconfiguration and refurbishment of a training room and office in Building 6395 at the USCG Cutter Chippewa moorings in Buchanan, TN. This opportunity is a 100% Total Small Business Set-Aside. Proposals are due by April 29, 2026, at 6:00 PM ET.
Scope of Work
The project involves approximately 1100 sq. ft. of renovation work. Key tasks include:
- Replacing/repairing insulation and vapor barrier.
- Installing new 1/2 inch gypsum sheetrock, taping, mudding, and painting.
- Installing a new acoustic ceiling grid system with tiles and a mounting plate for an overhead projector.
- Suspending HVAC ducting, electrical, and utilities above the new ceiling.
- Installing new HVAC ducting/registers, fifteen 2'x4' LED panel lights, and relocating a light switch.
- Adding eight new electrical receptacles and one ceiling outlet for a projector.
- Installing four ethernet data ports.
- Removing four existing windows and installing new vinyl replacement double-hung windows.
- Repairing concrete/applying self-leveling underlayment and installing Luxury Vinyl Plank Flooring.
- Contractor is responsible for providing a dumpster, cleanup, and protecting existing equipment/merchandise.
- Work must comply with the National Electric Code.
Contract Details
- Type: Firm-Fixed-Price Purchase Order (Combined Synopsis/Solicitation - RFQ)
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA (Repair Or Alteration Of Office Buildings)
- Place of Performance: USCG Cutter Chippewa, 700 Coast Guard Road, Buchanan, TN 38222.
- Performance Period: 14 calendar days from notice to proceed, to be completed within 60 calendar days after receiving award.
- Evaluation Factors: Price, Technical Acceptability, and Past Performance. Offerors must provide their price, technical approach, and past performance.
- Bonds: Payment and performance bonds are not required.
Key Requirements & Instructions
- Mandatory Site Visit: Prior to submitting a quote, a mandatory site visit is required to examine the scope of work, take field measurements, and become familiar with existing conditions. Contact MKC Southworth Knight at (706) 410-5764 or southworth.m.knight@uscg.mil to arrange.
- SAM.gov Registration: Offerors must be actively registered in SAM.gov.
- Wage Rates: Federal Acquisition Regulation (FAR) Clauses and Department of Labor Wage Rates for Construction (specifically for Henry County, TN) are applicable and must be considered for labor cost estimation.
- Contractor Licensing: Contractor must be licensed in the state of Tennessee with certifications for all work requirements.
- Submission: Quotes must be submitted to Joel.S.Ivy@uscg.mil.
Important Notes
- The work is to be performed in one room only.
- The Coast Guard will not relocate equipment or merchandise from the work areas.
- Contractors may store materials in the work space as no other interior storage is available.
- Utilities (electricity and potable water) will be made available without charge, but the contractor is responsible for connection costs. Temporary toilet facilities must be provided by the contractor.
- Work will be performed on an operational military installation; personnel must obey station regulations.
People
Points of Contact
Joel IvyPRIMARY
MKC Southworth KnightSECONDARY
Files
Versions
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 20, 2026