Regular Overhaul (ROH) for USNS RICHARD E BRYD (T-AKE 4) in the Indo-Pacific Region

SOL #: N6264926RL002Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 3, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Jan 2, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, through NAVSUP Fleet Logistics Center Yokosuka (FLCY) Site Singapore, has issued a competitive solicitation for the Regular Overhaul (ROH) without Dry-dock Availability of the USNS RICHARD E. BYRD (T-AKE 4). This opportunity is designated as a Total Small Business Set-Aside. The period of performance is from April 6, 2026, to June 4, 2026, with options extending to June 19, 2026. The place of performance is within the U.S. 7th Fleet Area of Responsibility (AOR), excluding India. Proposals are due by March 13, 2026, at 10:00 AM Singapore Standard Time.

Scope of Work

This solicitation requires comprehensive planning, document preparation, engineering, procurement, prefabrication, and shipyard production work to accomplish repairs, alterations, and maintenance for the USNS RICHARD E. BYRD (T-AKE 4). Key deliverables include:

  • Regular Overhaul (ROH) without Dry-Dock.
  • Physical Security (Option Line Items).
  • Continuation of Services (Option Line Item).
  • Growth Work (Time and Material CLINs).
  • Compliance with occupational and health standards for shipyard employment (29 CFR 1915).
  • Adherence to quality control procedures and stringent configuration control.
  • Management, procurement, production, testing, and technical capability.
  • Compliance with all security requirements (DD Form 254).

The detailed repair and maintenance package is specified in SSU SN 26-001. Work item references are available via DoD SAFE upon request to the point of contact.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) with Time and Material (T&M) CLINs.
  • Award Type: Single award.
  • Period of Performance: April 6, 2026 – June 4, 2026 (Options: June 5 – June 19, 2026).
  • Place of Performance: U.S. 7th Fleet Area of Responsibility (AOR), excluding India.
  • Set-Aside: Total Small Business Set-Aside (FAR 52.219-6 applies). If two or more responsible small businesses submit competitive offers, other offers will not be considered.
  • Governing Regulations: Federal Acquisition Regulation (FAR), Defense Federal Acquisition Regulation Supplement (DFARS), and Navy Marine Corps Acquisition Regulation Supplement (NMCARS).

Submission & Evaluation

  • Proposal Due Date: March 13, 2026, at 10:00 AM Singapore Standard Time.
  • Submission Method: Electronically. Offerors must be registered in SAM.gov to be eligible for award.
  • Evaluation Factors: Proposals will be evaluated based on:
    • Price: Lowest Total Price. T&M CLINs will be evaluated for reasonableness using FAR 15.404-1 procedures.
    • Technical: Understanding the Work Item Package, Ability to Perform the Work Item Package, and Management Control and Quality Assurance.
    • Past Performance.

Amendments & Clarifications

This solicitation has undergone multiple amendments (0001 through 0008), which have provided clarifications to offerors' questions, updated the period of performance, extended the submission deadline, and revised sections related to pricing and evaluation. Offerors must review all amendments to ensure their proposals are compliant with the latest requirements.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 10
Solicitation
Posted: Mar 10, 2026
View
Version 9
Solicitation
Posted: Jan 5, 2026
View
Version 8
Solicitation
Posted: Jan 2, 2026
View
Version 7
Solicitation
Posted: Dec 30, 2025
View
Version 6
Solicitation
Posted: Dec 30, 2025
View
Version 5
Solicitation
Posted: Dec 26, 2025
View
Version 4
Solicitation
Posted: Dec 22, 2025
View
Version 3
Solicitation
Posted: Dec 15, 2025
View
Version 2Viewing
Solicitation
Posted: Dec 15, 2025
Version 1
Solicitation
Posted: Dec 3, 2025
View