REHABILITATION OF MARSHALL FLOOD CONTROL WORK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army (USACE St. Paul District) is issuing a Presolicitation for the Rehabilitation of Marshall Flood Control Work in Marshall, Minnesota. This project involves repairing existing levees at two locations within the city limits. This procurement is a 100% Total Small Business Set-Aside and will be issued as an Invitation for Bid (IFB).
Scope of Work
The project entails rehabilitation of the existing levee system within Marshall, Minnesota. Work includes, but is not limited to:
- Minor clearing and tree removal
- Excavation
- Riprap and bedding placement
- Turf restoration
Contract & Timeline
- Type: Presolicitation (Invitation for Bid - IFB, in accordance with FAR Part 14 Sealed Bidding Procedures)
- Estimated Magnitude: Between $500,000 and $1,000,000
- Set-Aside: 100% Total Small Business Set-Aside
- NAICS: 237990; Other Heavy and Civil Engineering Construction (Small Business Size Standard: $45,000,000)
- Published: January 5, 2026
- Response Date: Not yet specified (Presolicitation)
Additional Notes
Payment and performance protection are required in accordance with FAR Part 28. This notice is for planning purposes; a formal solicitation will follow. For inquiries, contact Karl Just at karl.p.just@usace.army.mil or 651-290-5768.