REHABILITATION OF MARSHALL FLOOD CONTROL WORK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, St. Paul District (W07V ENDIST ST PAUL), under the Department of Defense, has issued an Invitation for Bid (IFB) for the Rehabilitation of Marshall Flood Control Work. This project involves repairing existing levees at two locations within Marshall, Minnesota. Bids are due April 10, 2026.
Scope of Work
The project entails rehabilitation of the Marshall Flood Control system, specifically repairing existing levees at two locations within Marshall, Minnesota (Lyon County). Work includes, but is not limited to, minor clearing and tree removal, excavation, riprap and bedding placement, and turf restoration.
Contract & Timeline
- Type: Invitation for Bid (IFB) in accordance with FAR Part 14 Sealed Bidding Procedures
- Magnitude: Between $500,000 and $1,000,000
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
- NAICS: 237990 (Other Heavy and Civil Engineering Construction)
- Product Service Code: Z1QA (Maintenance Of Restoration Of Real Property)
- Bids Due: April 10, 2026, 7:00 PM UTC
- Published: April 7, 2026
Evaluation
This procurement is issued as an Invitation for Bid (IFB) following FAR Part 14 Sealed Bidding Procedures. Payment and performance protection are required in accordance with FAR Part 28.
Additional Notes
For inquiries, contact KARL JUST at karl.p.just@usace.army.mil or 651-290-5768.