Removal & Installation of Windows at USCG Shore Side Detachment Main Building in Demopolis, AL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Coast Guard (USCG) is soliciting proposals for the complete removal and installation of windows in 14 rooms of the Shore Side Detachment (SSD) main building in Demopolis, AL. This opportunity is a 100% Total Small Business Set-Aside and will result in a firm-fixed priced purchase order. Quotes are due by March 3, 2026.
Scope of Work
This project requires qualified firms to provide all labor, materials, and equipment for the removal of existing windows and the installation of new ones in 14 rooms. The scope includes functionality testing of installed windows. Specific window dimensions and quantities have been clarified, including two 2'x2' windows, two 8'x3'3" windows, one 10'8"x3'11" window, three 10'8"x2' windows, one 5'4"x3'11" window, and seven 4'x6'3" windows. New windows must feature Solarzone – Energy Star glass and aluminum frames, compliant with local building codes.
Key Requirements & Performance
- Mandatory Site Visit: Highly recommended to visit the facility to assess existing conditions and take field measurements. Contact MKC Zachary Mason at (251)214-5671 or Zachary.S.Ivy@uscg.mil to arrange.
- Period of Performance: Work must be completed within 30 calendar days after the Notice to Proceed.
- Coordination: Contractor must coordinate with the USCG POC to minimize operational interference.
- Site Access & Security: Work will be on an operational military installation; personnel must comply with all regulations and remain within authorized work areas. A list of working personnel must be provided and approved.
- Safety: Contractor is responsible for worksite safety, implementing a safety program, and submitting a written safety plan within seven calendar days of award.
- Cleanup: Daily cleanup of the work area and proper disposal of waste are required.
- Compliance: Adherence to Federal, State, and local laws for demolition and debris disposal is mandatory. Department of Labor Wage Rates for Construction (General Decision Number AL20260080 for Marengo County, AL) are applicable.
Contract Details
- Contract Type: Request for Quotation (RFQ), resulting in a Firm-Fixed Price Purchase Order.
- Set-Aside: 100% Total Small Business Set-Aside.
- Evaluation Factors: Price, Technical Acceptability, and Past Performance.
- Registration: Offerors must be actively registered in SAM.gov.
- Bonds: Payment and performance bonds are not required.
Submission & Contact
Quotes must be submitted via email to Joel.S.Ivy@uscg.mil by March 3, 2026, at 7:00 PM EST.