Z--REMOVE DISCONTINUED CABLEWAYS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Geological Survey (USGS), Arizona Water Science Center, is seeking commercial services to dismantle and remove two discontinued cableway structures and associated components at two field locations. This combined synopsis/solicitation (140G0326Q0074) requires contractors to remove all debris and restore the areas. Proposals are due April 24, 2026.
Scope of Work
The contractor will dismantle and remove cableway structures, cables, saddle blocks, U-bars, A-frames, and all associated equipment. All debris must be hauled away, and U-bars cut off at the concrete surface. The work focuses solely on dismantling and removal, not construction or repair, with the goal of returning the area to as natural a state as possible. Compliance with OSHA and all applicable safety and environmental regulations is mandatory.
Amendment 0001 clarifies that work will be on White Mountain Apache Tribe lands, requiring coordination for site access, with contractors escorted by Tribal and USGS representatives. Tribal Employment Rights Office (TERO) requirements apply, and the contractor is responsible for direct coordination with the TERO office for compliance, fees, reporting, and workforce provisions. An additional cable segment (approx. 4 feet) at the Carrizo Creek site requires removal as a separately priced option (Item 00030).
Contract & Timeline
- Type: Combined Synopsis/Solicitation (implies Firm-Fixed-Price)
- Period of Performance: May 4, 2026, to August 4, 2026 (90 calendar days)
- Set-Aside: Not a small business set-aside
- Product/Service Code: Z1PZ - Maintenance Of Other Non Building Facilities
- Proposal Due: April 24, 2026, 05:00 PM (PDT)
- Published Date: March 27, 2026 (Solicitation), April 20, 2026 (Latest Amendment)
Submission & Evaluation
Proposals must be submitted via email to Joel Berberena (joel_berberena@ios.doi.gov). Award will be made on an all-or-none basis to the responsible offeror whose offer is most advantageous, considering price, technical capability, and past performance. Required submissions include a signed SF-18, a firm-fixed-price quote for both sites, a technical capability statement, and relevant representations/certifications. Offerors must provide a separately priced option for the additional cable removal at Carrizo Creek.
Additional Notes
The requirement is subject to Service Contract Labor Standards (SCLS), with Wage Determination 2015-577 (Rev. 12/03/2025) applicable. Contractors retain ownership of all removed materials. Electronic invoicing and payment will be through the Internet Payment Platform (IPP). Amendment 0002 confirms that the trail will remain open to visitors during the project, and contractors will have access to restrooms and parking facilities.