Repair Base Switching Station

SOL #: FA489726B0006Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Repair Or Alteration Of Epg Facilities Other, Including Transmission (Z2MZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 26, 2026
3
Submission Deadline
May 25, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting technical proposals for the Repair Base Switching Station project at Mountain Home Air Force Base (MHAFB), Idaho. This is a Total Small Business Set-Aside conducted via a Two-Step Sealed Bidding process. The project involves constructing a new electrical switching station, transitioning base loads, and demolishing the old station. Technical Proposals are due May 25, 2026.

Scope of Work

The project requires the construction of a new, complete, and operational electrical switching station (Building B1017) to current industry standards. This includes transitioning all base electrical loads from the existing station (Building 1406) to the new facility, followed by the demolition of Building 1406. Key work elements include site work, foundations, structural steel, installation of medium-voltage electrical equipment (12.47kV), control building construction, power ductbanks/conduits, and final commissioning. The scope also covers environmental requirements such as PCB sampling and soil testing for the demolition site, and the establishment of SCADA communications and a Mass Notification System.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Magnitude of Construction: Estimated between $10,000,000 and $25,000,000
  • Project Duration: 850 calendar days total (120 days for pre-construction, 730 days for construction)
  • Set-Aside: Total Small Business
  • Site Visit: May 5, 2026
  • Questions Due: May 12, 2026
  • Technical Proposals Due: May 25, 2026
  • Published Date: April 27, 2026

Submission & Evaluation

This is a Two-Step Sealed Bidding process. Step 1 requires the submission of unpriced technical proposals addressing specific requirements and evaluation criteria. No pricing information is allowed in this step. Proposals will be evaluated for acceptability based on factors including:

  • Technical Approach & Understanding
  • Transitioning Plan
  • Commissioning Plan
  • Excavation Plan
  • Traffic Flow & Parking Management
  • Relevant Experience
  • Key Personnel Qualifications
  • Safety Program
  • Quality Control/Assurance & Project Management Plan
  • Environmental Plan

Offerors with acceptable technical proposals will be invited to Step 2 to submit sealed price bids. The award will be made to the lowest responsive, responsible bidder.

Key Attachments

Bidders should review the comprehensive attachments, including:

  • Statement of Work (SOW): Details project objectives and requirements.
  • Design Analysis & Drawings: Provides 100% design specifications for the new and existing structures.
  • Specifications: Outlines detailed requirements for all construction elements.
  • One-Line Diagram & Diagrams: Visual representations of the electrical distribution system and site layout.
  • PCB Sampling and Analysis: Procedures for characterizing PCB remediation waste at Bldg 1406.
  • Provisions and Clauses: Lists all applicable FAR and DFARS clauses.

Additional Notes

Funds are not presently available, and no award will be made until funds are secured. The Government reserves the right to cancel the solicitation. Personnel requiring base access must comply with REAL ID Act requirements, effective May 7, 2025. Contact Ryan Rubenstein (ryan.rubenstein.1.@us.af.mil) for inquiries.

People

Points of Contact

Ryan RubensteinPRIMARY
Taylor InmanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 26, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View