REPAIR CRACKS AND SPALLS, B43421

SOL #: FA527025R0017Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5270 18 CONS PK
APO, AP, 96368-5199, United States

Place of Performance

Place of performance not available

NAICS

Poured Concrete Foundation and Structure Contractors (238110)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 1, 2025
2
Last Updated
Aug 4, 2025
3
Submission Deadline
Jul 21, 2025, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Amendment 0002: The purpose of this amendment is as follows:A) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this.B) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1.C) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change.D) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents for the entire proposal is removed.E) A Bid Guarantee is no longer required and reflected in block 13b.F) Removal of clause FAR 52.228-1 Bid Guarantee.G) No other changes at this time.NOTE: Refer to Sections L and M for further details on proposal submission changes.Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.

People

Points of Contact

Christopher NicolasPRIMARY
Emily RubinoSECONDARY

Files

Files

View
View
View
View

Versions

Version 6
Solicitation
Posted: Aug 4, 2025
View
Version 5Viewing
Solicitation
Posted: Jul 11, 2025
Version 4
Solicitation
Posted: Jul 9, 2025
View
Version 3
Solicitation
Posted: Jun 18, 2025
View
Version 2
Pre-Solicitation
Posted: Jun 18, 2025
View
Version 1
Pre-Solicitation
Posted: Apr 1, 2025
View