Repair of Circuit Breaker Panel

SOL #: 70Z03826QH0000021Combined Synopsis/SolicitationSole Source

Overview

Buyer

Homeland Security
Us Coast Guard
AVIATION LOGISTICS CENTER (ALC)(00038)
Elizabeth City, NC, 27909, United States

Place of Performance

Place of performance not available

NAICS

Other Support Activities for Air Transportation (488190)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Aircraft Components And Accessories (J016)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 26, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 20, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) Aviation Logistics Center (ALC) is seeking repair services for Circuit Breaker Panels (P/N: 458SUE2-1) installed on HC-130J aircraft. This is a combined synopsis/solicitation (RFQ 70Z03826QH0000021) issued as an unrestricted requirement. While all responsible sources may submit a quotation, an anticipated sole-source award is planned for GE Aviation - Ohio due to their exclusive possession of necessary technical data as the Original Equipment Manufacturer (OEM). Quotations are due March 20, 2026, by 12:00 PM EST.

Scope of Work

The requirement is for the repair of six (6) Circuit Breaker Panels (NSN: 5925-01-537-8655, P/N: 458SUE2-1) to a "Ready for Issue" (RFI) condition. This includes providing all necessary parts, labor, and materials. Repairs must be performed in accordance with applicable technical directives or USCG-approved alternate standards, ensuring components are returned in an airworthy condition. The USCG also has an option to increase the quantity by two (2) additional units, for a maximum of eight (8) units, at the same unit price within 365 days of the initial award. Corrosion is expected and must be addressed as part of the repair process.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Solicitation Number: 70Z03826QH0000021
  • Anticipated Award Type: Firm-Fixed Price Purchase Order
  • Set-Aside: Unrestricted
  • NAICS Code: 488190 (Maintenance, Repair And Rebuilding Of Equipment: Aircraft Components And Accessories)
  • Small Business Size Standard: $40,000,000.00
  • Anticipated Awardee: GE Aviation - Ohio (CAGE: 07639), justified under FAR 12.102(a) for sole-source due to OEM proprietary data.
  • Place of Performance: Contractor's facilities or USCG-approved locations.

Key Requirements & Evaluation

  • Technical Acceptability: Requires the contractor to be an OEM Certified Repair Facility (for both prime and sub-contractors), have access to the latest technical directives and manuals, demonstrate the ability to update technical data, and provide airworthiness certification (e.g., FAA 8130). A Quality Assurance System is mandatory.
  • Pricing: Award will be based on fair and reasonable pricing and an affirmative responsibility determination. If multiple responsible sources are identified, evaluation will be Lowest Priced, Technically Acceptable (LPTA). Bidders must complete Attachment 3 - Schedule for pricing.
  • Documentation: Required documentation includes Certificates of Conformance, Component Repair Records (CRR), and Certificate of Airworthiness.
  • Labor Standards: Adherence to the U.S. Department of Labor Wage Determination (No. 2015-4731, Rev. 28) for Ohio (Greene, Miami, Montgomery counties) is required for labor costs.

Timeline & Submission

People

Points of Contact

Shavon M. SmithPRIMARY
D05-SMB-LRS-Procurement@uscg.milSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 4, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
View
Repair of Circuit Breaker Panel | GovScope