REPAIR, RENOVATE PMEL

SOL #: FA252126B0001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2521 45 CONS PK
PATRICK SFB, FL, 32925-3237, United States

Place of Performance

Patrick AFB, FL

NAICS

Plumbing (238220)

PSC

Refrigeration And Air Conditioning Components (4130)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 9, 2026
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Mar 3, 2026, 3:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically Space Launch Delta 45, is soliciting bids for a Firm-Fixed-Price Construction Contract to repair and renovate the Precision Measurement Equipment Laboratory (PMEL), Building 981, at Patrick Space Force Base, FL. This project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The work involves replacing air handling units, associated control systems, and establishing an HVAC Emergency Shut-off. Bids are due March 3, 2026.

Scope of Work

The contractor will provide all labor, equipment, and materials to repair and construct the PMEL facility (Building 981) to meet Air Force Criteria for PMEL Design and Construction (FC 4-218-01F). Key tasks include:

  • Replacing all air handling units (AHU) and associated control systems identified by design analysis.
  • Establishing an HVAC Emergency Shut-off per UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, Standard 18.
  • Ensuring all work complies with State of Florida Building Codes and Wing Facility Excellence guidelines.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Construction Contract (Invitation for Bid).
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14).
  • Period of Performance: 365 calendar days, commencing 10 days after issuance of the Notice to Proceed (NTP). NTP to be issued within 30 days after award.
  • Response Due: March 3, 2026, at 3:30 PM EST.
  • Published Date: February 11, 2026.
  • Funding: The Government's obligation is contingent upon the availability of appropriated funds. No legal liability arises until funds are made available and the contractor receives written notice.

Key Requirements & Notes

  • Site Visit: A pre-bid site visit occurred on February 10, 2026, at Building 981. Rules of Engagement for the site visit were provided, detailing sign-in, photography restrictions, and the Q&A process.
  • Questions & Answers: Technical questions were not answered on-site. All questions must be submitted via the provided Q&A template by February 13, 2026, at 12:00 PM EST, to ricardo.diaz.14@spaceforce.mil, abigail.lynagh@spaceforce.mil, and patricia.bates@spaceforce.mil. Responses will be posted as an amendment on SAM.gov.
  • Technical Documents: Detailed Statement of Work (SOW), architectural and engineering drawings, and technical specifications are available, covering general requirements, concrete, thermal/moisture protection, finishes, HVAC, electrical, and electronic safety/security systems.
  • Environmental Compliance: The project does not require the use or delivery of Class I Ozone Depleting Substances (ODS). Contractors must complete a Hazardous Waste Generation form if hazardous materials are involved.
  • Wage Determination: Prevailing wage rates and fringe benefits for Brevard County, FL, are provided, including requirements for the Davis-Bacon Act and Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage).
  • Liquidated Damages: A determination for liquidated damages, based on daily personnel rates, is included, outlining financial implications for project delays.
  • Self-Performance Certification: Bidders must complete an SDVOSB Self-Performance Certification Worksheet to ensure compliance with FAR 52.219-14, Limitations on Subcontracting, requiring at least 25% of the contract performance (excluding materials) by the prime or similarly situated entities.

Points of Contact

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Feb 26, 2026
View
Version 5Viewing
Solicitation
Posted: Feb 11, 2026
Version 4
Solicitation
Posted: Feb 9, 2026
View
Version 3
Solicitation
Posted: Feb 2, 2026
View
Version 2
Solicitation
Posted: Jan 28, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 9, 2026
View
REPAIR, RENOVATE PMEL | GovScope