Timeline

1
Posted
Dec 15, 2025
2
Last Updated
Jan 30, 2026
3
Submission Deadline
Jan 7, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the replacement of the Holcomb Blvd Culvert Pipe at Marine Corps Base Camp Lejeune, NC. This project is a Historically Underutilized Business (HUBZone) Set-Aside with an estimated value between $250,000 and $500,000. Proposals are due January 7, 2026, at 3:00 PM EST.

Scope of Work

The project involves the demolition and removal of an existing reinforced concrete pipe (RCP), drop inlets, and a concrete headwall under Holcomb Blvd. This will be replaced with approximately 230 linear feet of new Class V 18-inch RCP, one new cast-in-place headwall, and two new precast drop inlets. Additional work includes installing rip rap at the discharge point, repairing damaged pavement markings, and cleaning out the existing outfall to restore flow.

Special requirements include measuring and recording inverts/elevations before demolition, disposing of all demolition debris off-base, protecting adjacent infrastructure, and implementing sheeting, shoring, and dewatering measures. The contractor is responsible for locating and protecting all underground utilities, including telecommunications and commercial cabling, and for submitting a traffic control plan 21 days prior to work commencement, ensuring two-way traffic is maintained on Holcomb Blvd. Handling of any encountered Asbestos-Containing Material (ACM) must follow specified procedures.

Contract Details

  • Contract Type: Solicitation (RFP)
  • Set-Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
  • Estimated Cost Range: $250,000 to $500,000
  • Period of Performance: 120 days after award
  • Liquidated Damages: $880 per calendar day
  • Eligibility: This is a limited competition; only Quadrant Construction, Inc., Civil Works Contracting, LLC, and Riza Construction, Inc. may submit proposals.

Submission & Evaluation

  • Proposal Due Date: January 7, 2026, 3:00 PM EST
  • Requests for Information (RFIs) Due: December 29, 2025, 3:00 PM EST
  • Submission Method: Proposals must be emailed to emily.a.walton6.civ@us.navy.mil AND lauren.f.loconto.civ@us.navy.mil. RFIs should be sent to emily.a.walton6.civ@us.navy.mil.
  • Evaluation Basis: Lowest Price, determined by the total price for Exhibit Line Items (ELINs) 0001 through 0004. Offerors must price all line items.
  • Bonds: Bid bonds are required based on dollar values: none for proposals <$35K, payment bond for $35K-$150K, and bid, payment, and performance bonds for >=$150K.
  • Amendments: Offerors must acknowledge Amendment 01, which includes revised drawings with existing utility details and a site visit roster.

Key Documents

Bidders must utilize the revised drawings provided in Amendment 01 and the pricing sheet (240041 Pricing Sheet Awarding All Options.pdf) to ensure accurate proposals.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3
Award Notice
Posted: Jan 30, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Dec 31, 2025
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Dec 15, 2025