Replace Lift Station 725, PAFB FL

SOL #: FA2521-19-B-0001Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2521 45 CONS PK
PATRICK SFB, FL, 32925-3237, United States

Place of Performance

PATRICK AFB, FL

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construct Of Structures/Facilities (Y)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Oct 30, 2018
2
Last Updated
Dec 10, 2018

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The contracting officer has reason to believe that the bids of an important segment of bidders have been delayed in the communications system specified for transmission of bids, specifically 45conslgcaebids@us.af.mil. Therefore, in accordance with (IAW) FAR 14-402-3, the bid opening has been postponed until 13 Dec 18. See Block 14 continuation on page 2 for specific details on the re-submission of e-bids.


Please refer to Solicitation FA2521-19-B-0001_01 (Amendment 1) for further details on bid submission instructions.

People

Points of Contact

Rosita SerranoContract SpecialistPRIMARY
Kimberly S. HornerContracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Pre-Solicitation
Posted: Dec 10, 2018
View
Version 6Viewing
Pre-Solicitation
Posted: Dec 6, 2018
Version 5
Pre-Solicitation
Posted: Nov 27, 2018
View
Version 4
Pre-Solicitation
Posted: Nov 27, 2018
View
Version 3
Pre-Solicitation
Posted: Oct 31, 2018
View
Version 2
Pre-Solicitation
Posted: Oct 30, 2018
View
Version 1
Pre-Solicitation
Posted: Oct 30, 2018
View