Replace Lift Station 725, PAFB FL

SOL #: FA2521-19-B-0001Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2521 45 CONS PK
PATRICK SFB, FL, 32925-3237, United States

Place of Performance

PATRICK AFB, FL

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construct Of Structures/Facilities (Y)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Oct 30, 2018
2
Last Updated
Dec 10, 2018

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Participants planning on attending the pre-site visit on 14 Nov 18 @1000 am will meet at the East Gate Visitor Center Pass & ID NLT 0945. In addition, participants will need to bring current car registration, insurance, and driver's license to be sponsored on the base. Entry to base will be denied without all these documents. Participants information will need to be e-mailed to rosita.serrano.1@us.afmil and sandra.seman@us.af.mil no later than 3:00 pm EST, Wednesday, 7 Nov 18. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees.

People

Points of Contact

Rosita SerranoContract SpecialistPRIMARY
Kimberly S. HornerContracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Pre-Solicitation
Posted: Dec 10, 2018
View
Version 6
Pre-Solicitation
Posted: Dec 6, 2018
View
Version 5
Pre-Solicitation
Posted: Nov 27, 2018
View
Version 4
Pre-Solicitation
Posted: Nov 27, 2018
View
Version 3Viewing
Pre-Solicitation
Posted: Oct 31, 2018
Version 2
Pre-Solicitation
Posted: Oct 30, 2018
View
Version 1
Pre-Solicitation
Posted: Oct 30, 2018
View