Replace Site Lighting Electrical Conduits at 5 LFs

SOL #: FA461326R0001Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4613 90 CONS PK
FE WARREN AFB, WY, 82005-2860, United States

Place of Performance

Sidney, NE

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 4, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 26, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 90th Contracting Squadron, is soliciting proposals for the replacement of site lighting electrical conduits at five Launch Facilities (LFs) located in Nebraska and Colorado. This is a 100% Small Business Set-Aside combined synopsis/solicitation for a construction requirement, with an estimated value between $100,000 and $250,000. The Government intends to award a Firm Fixed-Price contract. Proposals are due by Thursday, March 26, 2026, at 11:00 AM MT.

Scope of Work

The project, titled "Replace Site Lighting Electrical Conduits at 5 LFs," involves providing all labor, materials, equipment, and transportation to replace existing failed electrical conduits. Key tasks include:

  • Removing wire from existing failed conduit and abandoning it in place.
  • Installing new 1 1/2" PVC coated rigid conduit at a minimum depth of 36 inches.
  • Pulling new wire and connecting circuits.
  • Backfilling trenches with proper compaction and electrical warning tape.
  • Replacing gate switches with specified models. The work must comply with existing contract standards, codes, practices, and specifications, as detailed in the Statement of Work (Attachment 1). The period of performance is 120 calendar days from the Notice to Proceed; proposals exceeding this duration will be deemed technically unacceptable.

Contract Details

  • Contract Type: Firm Fixed-Price Construction Contract.
  • Estimated Magnitude: Between $100,000 and $250,000.
  • Period of Performance: 120 calendar days from Notice to Proceed.
  • Set-Aside: 100% Small Business Set-Aside (NAICS 236220, size standard $45M).
  • Applicable Regulations: FAR Part 13 (Simplified Acquisition Procedures), FAC 2025-06, DFARS, DAFFARS.
  • Wage Determination: Davis Bacon Act Wage Determinations apply (refer to Attachment 4).
  • Bonding: A Bid Guarantee (SF 24 Bid Bond Form, Attachment 5) is required with the proposal. Performance bonds are required for delivery/task orders of $150,000 and above, and payment protection for orders between $35,000 and $150,000.

Submission & Evaluation

  • Proposal Due Date: Thursday, March 26, 2026, by 11:00 AM MT.
  • Submission Method: Email only to megan.evans.3@us.af.mil and kyra.niece.us.af.mil.
  • Acceptance Period: Offers must be valid for 60 calendar days.
  • Evaluation Method: Lowest Price Technically Acceptable (LPTA).
    • Factor 1 (Price): Equally important as technical acceptability. Offers ranked by price.
    • Factor 2 (Technical): Equally important as price. Lowest priced offer evaluated for technical acceptability. Subfactors include Work Plan and Bid Guarantee/Bonding.
  • Mandatory Requirements:
    • Company must be registered in SAM.gov and meet the small business size standard.
    • Compliance with NIST SP 800-171 (score of 110 or improvement plan) or CMMC Level 2 in SPRS is required to obtain the CUI Map Layout (Attachment 3), which is essential for understanding the full project scope. Failure to obtain this may lead to an unacceptable proposal.
    • Proposals must include Attachment 6 Cost Estimate Breakdown.

Key Dates & Contacts

  • Site Visit Request Deadline: Thursday, March 12, 2026, by 11:00 AM MT. Email Ms. Megan Evans and SSgt Kyra Niece. Provide Driver's License images for EAL.
  • Questions Due: Day after the site visit, or Tuesday, March 17, 2026, by 11:00 AM MT if no site visit is requested. Submit via email to Ms. Megan Evans and SSgt Kyra Niece.
  • Primary Contact: Megan Evans (megan.evans.3@us.af.mil, 307-773-6645)
  • Secondary Contact: Kyra Niece (kyra.niece@us.af.mil, 307-773-3331)

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
AMENDMENT 01: Replace Site Lighting Electrical Conduits at 5 LFs | GovScope