Replacement of B3201 Grease Trap and Kitchen Cabinets

SOL #: FA303026R0004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3030 17 CONS CC
GOODFELLOW AFB, TX, 76908-4705, United States

Place of Performance

San Angelo, TX

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Submission Deadline
May 12, 2026, 9:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the Replacement of B3201 Grease Trap and Kitchen Cabinets at Goodfellow Air Force Base, San Angelo, TX. This project addresses an undersized and unserviceable grease trap causing frequent backups and health risks, alongside the replacement of kitchen cabinetry. This opportunity is a Total Small Business Set-Aside. Quotes are due by May 12, 2026, at 4:30 PM CST.

Scope of Work

The Contractor will be responsible for:

  • Removing, relocating, and replacing the existing grease trap at B3201 Crossroads Dining Facility with a new 90-gallon static holding capacity, 75 GPM, stainless steel grease interceptor (or approved equal), to be relocated to the exterior of the facility.
  • Demolishing and replacing all bottom cabinetry in the kitchen area to match existing.
  • Field verifying all dimensions, utility line locations, and site conditions prior to commencing work.
  • Ensuring all work adheres to prevailing industry standards, manufacturer's instructions, and applicable codes (OSHA, AFOSH, EPA, COE EM 385-1-1).

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Work must commence within 10 calendar days after award and be completed within 120 calendar days.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238220 (Commercial and Institutional Building Construction).
  • Size Standard: $19,000,000.00 Annual Receipts.
  • Bonds: Performance and Payment Bonds are required within 10 calendar days after award.
  • Place of Performance: 220 E. Kearney Blvd., Goodfellow AFB, San Angelo, Texas 76908-3218.

Key Dates & Actions

  • Site Visit: April 28, 2026, at 9:00 AM CDT at building 3201 on Goodfellow AFB.
  • Questions Due: May 01, 2026, by 1:00 PM CST. Submit electronically to Telvin.Jones@us.af.mil, CC: Armon.Brown.2@us.af.mil.
  • Answers Posted: May 06, 2026, by 1:00 PM CST.
  • Quotes Due: May 12, 2026, by 4:30 PM CST. Quotes must be provided electronically to the email addresses above, on company stationery/letterhead, include a capability statement, state validity for at least 30 calendar days, and acknowledge all amendments/terms.

Evaluation

Award will be based on a Lowest Price Technically Acceptable (LPTA) methodology.

Special Requirements & Notes

  • Liquidated Damages: The solicitation includes provisions for liquidated damages in case of project delays, with costs detailed for the first day and subsequent days of delay.
  • Base Access: Contractors must follow specific procedures for obtaining unescorted base access for personnel and vehicles, including vetting processes and compliance with vehicle operation rules on base.
  • Submittals: A comprehensive "Schedule of Material Submittals" outlines required documentation (e.g., product specifications, shop drawings, certifications) and the review/approval process.
  • Wage Determination: Bidders must adhere to the General Decision Number TX20260282 wage determination for building construction in Irion and Tom Green Counties, Texas, which specifies prevailing wage rates and fringe benefits.
  • Warranty: A minimum one-year warranty is required for all installed items.
  • Environmental Compliance: Strict adherence to environmental laws, proper handling/disposal of hazardous waste, and green purchasing policies are mandatory.
  • Work Clearance: Contractors must obtain a Base Civil Engineer Work Clearance Request (AF Form IMT 103) before starting work.

People

Points of Contact

SrA Telvin JonesPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 12, 2026
Replacement of B3201 Grease Trap and Kitchen Cabinets | GovScope