Request for Information (RFI) - Mid‑energy electron beam (eBeam) systems
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Pacific Northwest National Laboratory (PNNL) is issuing a Request for Information (RFI) to gather details on mid-energy electron beam (eBeam) systems for medical device sterilization applications. This RFI aims to compile technical approaches, configurations, and lead times to inform a future Request for Proposal (RFP) for a self-shielded system. Responses are due June 1, 2026.
Purpose & Scope
PNNL, on behalf of the U.S. Department of Energy, seeks information from qualified suppliers to understand available technical approaches, configurations, safety/shielding concepts, footprint/integration constraints, validation-support capabilities, and likely lead times for eBeam systems. The ultimate goal is to procure a self-shielded system deployable at end-of-line (EOL) with optional in-line capability for terminal and adjunctive sterilization of medical products.
Key Information Requested
Vendors are asked to provide details on:
- Technical Solution: Accelerator technology, energy spectrum, uptime, scan-horn, beam monitoring, dose rates.
- Product/Density Application Fit: System efficiency, examples of handled products, fixturing/packaging.
- Self-Shielding & Facility Interface: Materials, thicknesses, dose maps, facility requirements (power, cooling, exhaust), installation clearance.
- Controls, Data, & Cyber/Connectivity: HMI/PLC platform, data logging, interface protocols.
- Testing Support & Validation: FAT/SAT criteria, commissioning, dosimetry, documentation for process validation.
- Project Execution & Schedule: Typical lead times, FAT to SAT timelines, major project phases.
- Service & Sustainment: Preventive maintenance, spare parts (lifetimes, lead times, prices), service contract options.
- Rough Order of Magnitude (ROM) Pricing: Budgetary estimates for base system, shipping, installation, training, optional features, annual service.
- Risks & Constraints: Key technical or operational risks and mitigation strategies.
Submission Details & Timeline
- RFI Release Date: April 24, 2026
- Questions Deadline: May 18, 2026
- RFI Response Due Date: June 1, 2026
- Submission Format: Searchable PDF (narrative limited to 25 pages, excluding datasheets/appendices). Excel for pricing/spares is optional. Include a requirements compliance matrix.
Important Notes
This RFI is for informational purposes only and does not constitute a commitment to contract. Responses will inform future procurement decisions. Proprietary information must be clearly identified. The desired system is self-shielded, deployable at EOL with optional in-line capability, supporting continuous conveyance.