Request for Information (RFI) - Mid‑energy electron beam (eBeam) systems

SOL #: 42426-RDPre-Solicitation

Overview

Buyer

Energy
Energy, Department Of
PNNL CONTRACTS - DOE CONTRACTOR
Richland, WA, 99352, United States

Place of Performance

Richland, WA

NAICS

Other Electronic Component Manufacturing (334419)

PSC

Analysis Instruments, Medical Laboratory Use (6632)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
May 27, 2026
3
Response Deadline
Jun 12, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Pacific Northwest National Laboratory (PNNL) is conducting a Request for Information (RFI) to gather data on mid-energy electron beam (eBeam) systems for medical device sterilization applications. This RFI aims to inform the development of a future Request for Proposal (RFP) for self-shielded systems deployable at end-of-line (EOL) with optional in-line capability. Responses are due June 1, 2026.

Purpose & Scope

PNNL, on behalf of the U.S. Department of Energy, seeks information from qualified suppliers regarding eBeam systems. The goal is to compile technical approaches, configurations, safety/shielding concepts, footprint/integration constraints, validation support capabilities, and likely lead times. The RFI focuses on defining specifications for an anticipated RFP, not on immediate procurement.

Key Information Requested from Vendors

Vendors are asked to provide details on:

  • Technical Solution: Accelerator technology, energy spectrum (2.0 MeV most-probable energy), uptime, scan-horn, beam monitoring, dose rates.
  • Product/Density Application: System efficiency, product examples, fixturing/packaging.
  • Self-Shielding & Facility Interface: Shielding materials (preference for metal), dose maps, facility requirements (power, cooling, environment), clearance.
  • Controls, Data, & Connectivity: HMI/PLC, data logging, interface protocols.
  • Testing & Validation: FAT/SAT criteria, commissioning, dosimetry, documentation for process validation.
  • Project Execution: Typical lead times, FAT to SAT timelines, project phases.
  • Service & Sustainment: Preventive maintenance, spare parts, service contract options.
  • Risks & Constraints: Technical/operational risks and mitigation strategies.

Clarifications & Important Notes

  • This RFI is for informational purposes only and does not constitute a commitment to contract. Responses will inform future procurement decisions.
  • Pricing information is NOT requested at this stage. The RFI seeks technical and operational insights.
  • The desired system is self-shielded, deployable at EOL, with optional in-line capability, supporting continuous conveyance.
  • Initial units are intended for government purchase and integration by medical device manufacturers.
  • The medical device manufacturer is responsible for regulatory engagement, but eBeam vendor support for IQ, OQ, and PQ is necessary.

Submission Details

  • RFI Release Date: April 24, 2026
  • Questions Deadline: May 18, 2026
  • RFI Response Due Date: June 1, 2026
  • Submission Format: Searchable PDF (Excel optional for spares). Narrative limited to 25 pages (excluding datasheets/appendices). Include a requirements compliance matrix.

Contract & Timeline

  • Type: Request for Information (RFI) / Presolicitation
  • Published: May 27, 2026
  • Response Due: June 1, 2026
  • Set-Aside: None specified

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 3Viewing
Pre-Solicitation
Posted: May 27, 2026
Version 2
Pre-Solicitation
Posted: May 22, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 24, 2026
View