RFI: Integration of Advanced Medium Mobile Power Sources (AMMPS) Kits Amendment 1

SOL #: W909MY-26-R-TRLRSources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-APG CONT CT WASH OFC
ALEXANDRIA, VA, 22331-0700, United States

Place of Performance

Fort Belvoir, VA

NAICS

Truck Trailer Manufacturing (336212)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
May 13, 2026
3
Response Deadline
May 13, 2026, 7:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is conducting market research through a Request for Information (RFI) to identify sources capable of integrating Advanced Medium Mobile Power Sources (AMMPS) Kits onto either the 1-ton Light Tactical Trailer Heavy Chassis (LTT-HC) or the 2.5-ton M200A1 trailer. This RFI, Amendment 1, addresses industry questions and extends the response deadline. Responses are due May 13, 2026, at 3:30 PM EST.

Scope of Work & Key Information Requested

The Army seeks information on vendors' capabilities to integrate AMMPS Kits. This involves fabricating or procuring mounting hardware, brackets, and cables, and installing these components along with Government Furnished Equipment (GFE) according to the government's Technical Data Package (TDP). The final integrated system must be safely towable and meet military environmental durability requirements.

Respondents are requested to submit capability statements addressing:

  • Company Overview: Including CAGE Code, UEI, Point of Contact, and company size under NAICS code 336212 (Truck Trailer Manufacturing).
  • Past Performance & Experience: Specific examples of integrating electrical/mechanical systems into vehicle/trailer platforms, especially power generation equipment, within the last three years.
  • Production and Integration Capabilities: Facility details, maximum monthly production capacity, storage, and shipping coordination.
  • Programmatic Information: A Rough Order of Magnitude (ROM) cost estimate per system for integrating the PP-3106A (most complex) and PU-2001A (least complex) power plants. This estimate should include Non-Recurring Engineering (NRE) and Recurring Per-Unit Production Costs for 50 units, along with potential cost savings and lead time assumptions.
  • Engineering and Security: Engineering capabilities for mechanical/electrical integration, quality control processes, and facility security clearance.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Set-Aside: None specified (market research for NAICS 336212)
  • Response Due: May 13, 2026, at 3:30 PM EST
  • Published: May 6, 2026 (Amendment 1)
  • Place of Performance: Fort Belvoir, VA (though GFE will be delivered to vendor's facility)

Submission Requirements

Capability statements must be submitted electronically in Microsoft Word or Adobe PDF format. The "Company Overview" section is limited to two pages, while other sections have no page limits. Proprietary information should be avoided or clearly marked.

Additional Notes

This RFI is for informational and planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue one. No contract will be awarded based on this RFI, and no payment will be made for submitted information. The competitive TDP will be provided as GFI under subsequent competitive action. Contact: Mary Suda (mary.a.suda.civ@army.mil) and Shahaadah C. Nalls (shahaadah.c.nalls.civ@army.mil).

People

Points of Contact

Mary SudaPRIMARY
Shahaadah C. NallsSECONDARY

Files

Files

Download

Versions

Version 4
Sources Sought
Posted: May 13, 2026
View
Version 3
Sources Sought
Posted: May 6, 2026
View
Version 2Viewing
Sources Sought
Posted: May 6, 2026
Version 1
Sources Sought
Posted: Apr 13, 2026
View