RFQ - High Pressure Tube Trailer Recertification and Refurbishment

SOL #: 371489-BHCombined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
FERMILAB - DOE CONTRACTOR
Batavia, IL, 60510, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Maintenance And Repair Shop Equipment (J049)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 24, 2026
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Mar 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Fermi Forward Discovery Group, LLC (FermiForward), operating the Fermi National Accelerator Laboratory (FNAL) under a U.S. Department of Energy contract, is seeking proposals for a Firm-Fixed-Price (FFP) subcontract for High Pressure Tube Trailer Recertification and Refurbishment. The services are required for FNAL 477 High Pressure Tube Trailers located at the Fermi National Accelerator Laboratory campus in Batavia, Illinois. Quotes are due by Thursday, February 26, 2026, at 3:00 PM CST.

Scope of Work

The required services include comprehensive recertification and refurbishment of the FNAL 477 High Pressure Tube Trailer. This involves:

  • Performing Department of Transportation (D.O.T.) recertification tests for the tubes.
  • Inspecting and potentially replacing burst disks, providing certificates and test results.
  • Addressing defective tubes through plugging, rerouting manifolds, or replacement, subject to approval.
  • Inspecting and refurbishing the 5th wheel plate, pin, wheels, wheel bearings, and brakes.
  • Sandblasting and painting the chassis, cabinet, and tubes white.
  • Refurbishing the valve cabinet and manifold, including appropriate pressure and temperature gauges.
  • Performing pressure testing on piping per ASME B31.3 and providing certification.
  • Ensuring welding complies with ASME B31.3 requirements, including PQR, WPS, WPQ, and material certifications.
  • Applying specified D.O.T. diamond product labels, safety warnings, and specific lettering (FERMILAB, HELIUM, COMPRESSED, FNAL 477).
  • Installing a data plate within the valve cabinet with trailer information.
  • Shipping the trailer sealed with dry inert gas (nitrogen) after recertification.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) subcontract.
  • Period of Performance: 30 calendar days after receipt of order.
  • Set-Aside: None specified.
  • Quote Validity: Quotes must remain valid for at least 90 calendar days.
  • Government Furnished Property: No Government-furnished equipment, property, or services are anticipated.

Submission & Evaluation

Quotes must be submitted via email to bhopkins@fnal.gov by February 26, 2026, 3:00 PM CST. Evaluation will be conducted on a Lowest Price Technically Acceptable (LPTA) basis, considering three factors:

  1. Technical (Acceptable/Unacceptable): Requires a minimum of five years of experience, evidence of qualified personnel, and a project schedule.
  2. Price: Evaluated for completeness and reasonableness, requiring completion of Exhibit 05 – Pricing Schedule / Unit Price Sheet (Attachment B).
  3. Responsibility: Determination of the offeror's responsiveness and responsibility.

Award is anticipated without discussions to the lowest-priced, technically acceptable, responsive, and responsible offeror.

Key Attachments & Requirements

Bidders must review and complete several critical documents, including:

  • Attachment A - Statement of Work (SOW): Details the full scope of work.
  • Attachment B - Pricing Schedule: Mandatory for submitting pricing.
  • Attachment C - General Terms and Conditions: Outlines contractual obligations and flow-down clauses.
  • Attachment D - ES&H Requirements (Exhibit A): Details mandatory Environment, Safety, and Health protocols for work at Fermilab.
  • Attachment E - Subcontractor Annual Representations & Certifications (SARC): Required for business status and compliance.
  • Attachment F - Proposal Certifications: Mandatory certifications regarding export control, Buy American Act, data rights, patent rights, responsibility matters, and trafficking in persons.

Compliance with all certifications and submission of required documents are crucial for a responsive proposal.

People

Points of Contact

Brittany HopkinsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
RFQ - High Pressure Tube Trailer Recertification and Refurbishment | GovScope